SERVICE PARTS INFORMATION 3
Check Point 2 : Check Coil of EEV
Yellow - Red
Blue - Red
White - Red
Read wire
46
Resistance value
Check Point 1 : Check Connections
Check Point 5 : Check Opening and Closing Operation of Valve
Check Point 4 : Check Voltage from Main PCB.
Pipe (In)
Pipe (Out)
Pipe (In)
CLOSE
Example : Hot Gas
OPEN
Example : Hot Gas
Pipe (Out)
Pipe (In)
Pipe (Out)
Pipe (In)
Pipe (Out)
Check Point 6 : Check Strainer
DC
CN600
EV
RED
1
2
3
4
5
at 20°C
Outdoor unit Electronic Expansion Valve
( EEV )
Check connection of connector (CN40)
( Loose connector or open cable )
If Resistance value is abnormal, replace EEV.
Remove Connector and check Voltage (DC12V)
Turn on Power and check operation noise.
If an abnormal noise does not show,
replace Main PCB.
When Valve is closed,
it has a temp. difference between Inlet and Outlet.
If it is open,
it has no temp. difference between Inlet and Outlet.
Strainer normally does not have temperature difference between inlet and outlet as shown in ,
but if there is a difference as shown in , there is a possibility of inside clogged. In this case, replace Strainer.
02-27
1
2
3
4
5
If it does not appear, replace Main PCB.
Remove connector, check each winding
resistance of Coil.
WHITE
YELLOW
ORANGE
BLUE
EXPANSION
VALVE COIL
Check Point 3 : Check Noise at start up
4
Orange - Red
Содержание G07LMCA
Страница 3: ...1 DESCRIPTION OF EACH CONTROL OPERATION R410A WALL MOUNTED type INVERTER ...
Страница 25: ...2 TROUBLE SHOOTING R410A WALL MOUNTED type INVERTER ...
Страница 55: ...3 APPENDING DATA R410A WALL MOUNTED type INVERTER ...
Страница 61: ...3 3 17 Suenaga Takatsu ku Kawasaki 213 8502 Japan ...