CHAPTER 2
Core Configuration
Storing, Unpacking, and Inspecting Equipment
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
2-12
Fujitsu and Fujitsu Customer Use Only
2
Before unpacking the equipment rack, inspect the container (see
signs of shipping damage. Claims for shipping damage must be filed with the transportation
company in accordance with their published procedure.
Note:
A shipping label is located on the front of the equipment rack container. Compare this with the
shipping documents.
3
Is this the correct shipment for this location?
If YES:
If NO:
4
Using all data sheets and job engineering drawings, verify that the information matches the
installation site.
5
Using industrial shears, cut the two shipping bands from the container. See
for the location of the shipping bands.
After the last shipping band is cut, the top of the shipping container will fall away.
Figure 2-8: Example of an Equipment Rack in Shipping Container
r1252_
1
Revision 1, June 2009
Содержание FLASHWAVE 7500
Страница 8: ...Revision 1 June 2009 ...
Страница 10: ...Revision 1 June 2009 ...
Страница 16: ...Revision 1 June 2009 ...
Страница 362: ...Revision 1 June 2009 ...
Страница 386: ...Revision 1 June 2009 ...