CHAPTER 3
Small Configuration
Installing Power, Ground, and Alarm Cables
3-95
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
3.16.2
Installing Power,
G
round, and Alarm Cables
S
UBTASK
P
A
G
E
This subprocedure includes the following subtasks:
P
r
o
c
e
d
u
r
e
Use this procedure to install power, ground, and alarm cabling for a rack of FLASHWAVE
7500 Small Configuration equipment.
DAN
G
ER:
Use properly insulated tools and do not allow tools, cables, or other metal objects to
connect across terminals. At this point, –48 V DC power has been applied to the CBP, and
improper handling may result in personal injury, damage to equipment, or both. Fujitsu
recommends that office power be removed from the rack using local procedures.
Note:
Ensure that all cables installed in this procedure are properly bundled, laced, and secured
to the rack in accordance with local procedures. Connectors should be secured in place using
connector retaining screws.
Revision 1, June 2009
Содержание FLASHWAVE 7500
Страница 8: ...Revision 1 June 2009 ...
Страница 10: ...Revision 1 June 2009 ...
Страница 16: ...Revision 1 June 2009 ...
Страница 362: ...Revision 1 June 2009 ...
Страница 386: ...Revision 1 June 2009 ...