CHAPTER 3
Small Configuration
Connecting and Checking Office Battery to the CBP
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
3-30
Fujitsu and Fujitsu Customer Use Only
3.7
Connecting and Checking Office Battery to the CBP
N
O
.
S
UBSECTION
P
A
G
E
This section includes the following subsections:
S
e
c
t
i
o
n
If not done previously as part of an earlier FLASHWAVE 7500 installation, the office-battery
power cables must be connected to the CBP power input connectors. However, the
office-battery ends of the power cables must not be connected to the primary power source
until the CBP is completely installed.
Note:
In this section, the term
battery
refers to the office DC power feed for the bay in which
the equipment is being mounted.
The CBP supports four separate battery/return power sources:
■
BATT A1/RTN A1
■
BATT A2/RTN A2
■
BATT B1/RTN B1
■
BATT B2/RTN B2
Each power input connection consists of a pair of parallel-wired, threaded studs. For example,
BATT A1 and RTN A1 both have two threaded studs.
An additional connector is provided for frame ground.
For additional details about the CBP, refer to
.
The following tools are required:
■
No. 1 Phillips screwdriver
■
7/16 inch socket wrench
Revision 1, June 2009
Содержание FLASHWAVE 7500
Страница 8: ...Revision 1 June 2009 ...
Страница 10: ...Revision 1 June 2009 ...
Страница 16: ...Revision 1 June 2009 ...
Страница 362: ...Revision 1 June 2009 ...
Страница 386: ...Revision 1 June 2009 ...