background image

48

Operating Manual

 

ETERNUS JX40 S2

SAS Connection

Connections

© c

o

g

n

it

as

. Ges

e

lls

c

h

ft

 fü

T

e

c

hnik

-Dok

u

ment

at

ion mbH 2015 

Pf

ad:

 C:

\Us

e

rs

\guda

t\

Doc

u

ment

s

\___

___F

T

S

\_

ST

O

R

A

G

E\

J

X

40_

S2\

F

M\

s

x

4

0

-ba

-en\

s

x

40

-ba-en

.k

06

Figure 23: SAS connections of an ETERNUS JX40 S2 I/O module (Mini SAS HD ports)

1. SAS IN port

2. SAS OUT port

Ê

Set up the data connection between the server and the storage subsystem 
by inserting the Mini SAS HD plug of the SAS cable coming from the server 
into the SAS IN port connector of the ETERNUS JX40 S2 storage 
subsystem.

I

The cable tab must always be located at the lower side of the plug.

Figure 24: Orientation of the Mini SAS HD plugs 

Ensure that the plug engages securely to the SAS connector. Only in 
this way can the flow of data between the server and the storage 
subsystem be guaranteed.

For removing the SAS cable, the blue tab needs to be pulled out.

1

2

Содержание ETERNUS JX40 S2

Страница 1: ...ETERNUS JX40 S2 Storage Subsystem Operating Manual Edition August 2015 ...

Страница 2: ...as Gesellschaft für Technik Dokumentation mbH www cognitas de Copyright and Trademarks cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en vor Copyright 2015 Fujitsu Technology Solutions GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software na...

Страница 3: ... capacitors used in the product s printed circuit board assemblies and in the mouse and keyboard are limited life components Use of these components beyond their operating life may result in electrolyte leakage or depletion potentially causing emission of foul odor or smoke As a guideline in a normal office environment 25 C operating life is not expected to be reached within the maintenance suppor...

Страница 4: ...y caused by lightning To prevent a momentary voltage drop use of an AC uninterruptible power supply is recommended This notice follows the guidelines of Voltage Dip Immunity of Personal Computer issued by JEITA the Japan Electronics and Information Technology Industries Association Technology controlled by the Foreign Exchange and Foreign Trade Control Law of Japan Documents produced by FUJITSU ma...

Страница 5: ... Electrostatic sensitive Component Label 17 2 3 CE Certificate 18 2 4 FCC Class A Compliance Statement 18 2 5 Notes on Mounting the Rack 19 2 6 Notes on Transportation 19 2 7 Environmental protection 20 3 Installation 23 3 1 Installation Steps 23 3 2 Unpacking the Storage Subsystem 24 3 3 Installing the ETERNUS JX40 S2 in the Rack 25 3 3 1 Requirements of the Rack 25 3 3 2 Rack mounting 26 3 4 Swi...

Страница 6: ... 5 2 Removing Installing Hard Disk Drive Drive Dummy 42 6 Connections 47 6 1 SAS Connection 47 6 2 Power Supply Connection 49 7 Configurations 51 7 1 Basic RAID controller HBA configuration 51 7 2 RAID controller HBA configuration and maximal storage configuration 52 7 3 RAID controller HBA configuration with two way storage 53 7 3 1 Host Bus Adapter 53 7 4 Redundant controller and storage two way...

Страница 7: ...58 8 1 4 I O Module IOM 59 8 1 5 Temperature Sensor Error Message 59 8 1 6 Error LED of the Hard Disk Drive Indicates Disk Failure 59 8 1 7 The ETERNUS JX40 S2 does not Power on with the Attached Server 60 9 Replacing Components 61 9 1 Power Supply Unit 61 9 2 I O Module 63 9 3 Operation Panel 64 Abbreviations 67 Figures 75 Tables 77 Related Publications 79 Index 81 ...

Страница 8: ...Operating Manual ETERNUS JX40 S2 Contents cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en ivz ...

Страница 9: ...BA port Server Management ServerView Only for connection to PRIMERGY servers and ServerView Suite package ServerView and the related agents are set up within the group of servers and storage subsystems being monitored The received informations are evaluated by ServerView and processed for display or forwarding to the administrator manager I When installing ETERNUS JX40 S2 storage subsystem in conn...

Страница 10: ...cture of the Manual The ETERNUS JX40 S2 storage subsystem manual describes how to install and configure the subsystem and perform expansions or upgrades You will find further information in the documentation of your PRIMERGY server This manual consists of the following chapters Important Notes This chapter contains instructions on the safe operation of your storage subsystem as well as information...

Страница 11: ...f the storage subsystem Replacing Components This part of the manual describes the fitting and removing of power supply units and I O modules 1 3 Documentation Overview More information on the subsystem can be found in the following documents SETUP ETERNUS JX40 S2 SAS 2 5 3 5 HDD leaflet はじめにお読み く だ さい for the Japanese market only included as a printed copy Safety notes and other important informa...

Страница 12: ...cates additional information notes and tips V CAUTION indicates warnings which if ignored will endanger your health the operability of your server or the security of your data Table 1 Notation conventions Installation specification 19 rackmount 2 U height units Dimension W x D x H 2 5 482 x 540 x 88 mm 3 5 482 x 560 x 88 mm Weight 35 kg depending on the number of disks installed Service area Front...

Страница 13: ... pressure LpAm 43 5 db A Noise notes measured according to ISO7779 and declared according to ISO9296 Operating environment FTS 04230 Guideline for Data Center installation specifications Operating environment link http globalsp ts fujitsu com dmsp Publications public FTS 04230 Specification for DataCenter pdf Compliance Product safety UL 60950 1 CSA C22 2 No 60950 1 EN 60950 1 IEC 60950 1 Electrom...

Страница 14: ...ssibly updated information refer to the ETERNUS JX40 S2 Data Sheet available at www Fujitsu com eternus Compliance notes There is general compliance with the safety requirements of all European countries and North America National approvals required in order to satisfy statutory regulations or for other reasons can be applied for on request Comliance link http globalsp ts fujitsu com sites certifi...

Страница 15: ...med by service personnel Any unauthorized openings and improper repairs could expose the user to risks electric shock energy hazards fire hazards and could also damage the equipment Please note that any unauthorized openings of the device will result in the invalidation of the warranty and exclusion from all liability Transport the device in its original packaging or in other suitable packaging wh...

Страница 16: ...s manual Never connect or disconnect data transmission lines during a storm lightning hazard Systems which comprise a number of cabinets must use a separate fused socket for each cabinet The servers and the directly connected external storage subsystems should be connected to the same power supply distributor Otherwise you run the risk of losing data if for example the central processing unit is s...

Страница 17: ...components Ê The equipment and tools you use must be free of static charge Ê Remove the power plug before installing or removing modules containing electrostatic sensitive components Ê Only hold modules containing electrostatic sensitive components by their edges Ê Do not touch any of the pins or track conductors on a module containing electrostatic sensitive components Ê Use a grounding strap des...

Страница 18: ...ons However there is no warranty that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separat...

Страница 19: ...When connecting and disconnecting cables observe the notes in the operating manual of your PRIMERGY system and the comments in the Important notes chapter in the technical manual supplied with the rack Ensure that the anti tilt bracket is correctly mounted when you set up the rack For safety reasons no more than one unit may be withdrawn from the rack at any one time during installation and mainte...

Страница 20: ...he Japanese market Energy saving information Devices that do not need to be constantly switched on should be switched off until they are needed as well as during long breaks and after completion of work Packaging information This packaging information doesn t apply to the Japanese market Do not throw away the packaging You may need it later for transporting the system If possible the equipment sho...

Страница 21: ...ng used devices manual via your local Fujitsu branch or from our recycling center in Paderborn Fujitsu Technology Solutions GmbH Remarketing and Recycling D 33106 Paderborn Tel 49 5251 525 1410 Fax 49 5251 525 32 1410 The device must not be disposed of with domestic waste This device is labeled in compliance with European directive 2002 96 EC on waste electrical and electronic equipment WEEE This ...

Страница 22: ...nvironmental protection Important Notes cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k02 This page is intentionally left blank for printing reasons ...

Страница 23: ...allation steps are described in detail in other sections of this chapter Ê Unpacking the storage subsystem Ê Inserting the storage subsystem into the rack Ê Cabling the storage subsystem see section SAS Connection on page 47 Ê Setting the desired system parameters Ê Connecting the storage subsystem to the mains voltage see section Power Supply Connection on page 49 Ê Switching ON the storage subsy...

Страница 24: ...please refer to manual 安全上のご注意 Enlist the help of others to carry the storage subsystem You should retain the original packing of the storage subsystem for possible further transport Ê Unpack all parts Ê Check the contents of the package for visible transport damage Ê Check whether the delivery matches the information given on the delivery note Ê Check whether the first page of the guarantee bookl...

Страница 25: ...irements of the Rack The PRIMECENTER M1 Rack systems from Fujitsu with a depth of 1050 mm support the installation of the subsystem For the installation in 3rd Party racks please ask your customer service To accommodate the ventilation concept and ensure proper ventilation of the components in the rack any unused areas must be closed using dummy covers Power is supplied via the socket strips avail...

Страница 26: ...The descriptions and figures in this section refer to the current support system For other support systems you will find the appropriate description in the packaging of the rack mounting kit For installation in the PRIMECENTER Rack the rack mounting kit delivered with the subsystem is used Figure 2 Rack mounting kit 1 Left sliding rail rear end 2 Screws cage nuts and mounting instruction 3 Right s...

Страница 27: ...t Side of the Rack rear left rear right with support bracket front left front right Legend height units U counted starting from the bottom line of the subsystem rear left and rear right seen from the rear side of the rack front left and front right seen from the front side of the rack M5 cage nut M5 screw with centering washer mounting spring 2 U 1 U 2 U 1 U 1 U 2 U 1 U 2 U 2 U 1 U 2 U 1 U 1 U 2 U...

Страница 28: ...pport bracket must first be mounted on the rear left support upright The bracket must be mounted level with the lower edge of the device Figure 4 Installing the support bracket Ê Refer to the assembly instructions in the Technical Manual for the PRIMECENTER rack see also Related Publications on page 79 I For better orientation the height units are marked on the support uprights Ê Mount the support...

Страница 29: ...Insert the sliding rails in the rack Compress the sliding rail to its length Figure 5 Right side sliding rail rear side of the rack tapered mounting bolts at height unit 13 Figure 6 Left side sliding rail rear side of the rack tapered mounting bolts at height unit 13 ...

Страница 30: ... profiles on the front Figure 7 Position of the cage nuts front side of the rack left support upright as example Ê Place the cage nuts for fastening the subsystem in the appropriate holes of the front support uprights Ê Put the subsystem on the support angles of the sliding rails and push the subsystem into the rack as far as it will go The following steps can be performed by a single person Figur...

Страница 31: ...ystem ON OFF Ê Route the cables as described in the Technical Manual of the PRIMECENTER Rack 3 4 Switching the Storage Subsystem ON OFF The ETERNUS JX40 S2 PSUs have power switches Automatic power on via SAS Link can only be used if the PSU power switches are set to ON ...

Страница 32: ...tching the Subsystem ON OFF Installation cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k08 This page intentionally is left blank for printing reasons ...

Страница 33: ...tor elements on the ETERNUS JX40 S2 storage subsystem 4 1 Front Side An operation panel is installed in the front of the ETERNUS JX40 S2 storage subsystem Figure 10 Front of the ETERNUS JX40 S2 2 5 disk slot numbering below Figure 11 Front of the ETERNUS JX40 S2 3 5 disk slot numbering below 1 Operation panel 2 2 5 3 5 disk drive 3 Flange covers ...

Страница 34: ...40_S2 FM sx40 ba en sx40 ba en k03 4 1 1 Operation Panel Figure 12 Operation panel 1 ID number The number identifies the drive enclosure 2 Identify LED 3 Fault LED 4 Power LED LED LED Status Meaning Identify blinks blue Specifies the installation location of the storage subsystem Fault amber The drive enclosure is in error status Power green DC power is supplied to the drive enclosure ...

Страница 35: ...ements Front Side 4 1 2 Disk LEDs Figure 13 Disk LEDs LED LED Status Meaning Ready green The disk drive is in normal status blinks green Fault amber The disk drive is in error status blinks amber Identifies the location of the drive Ready LED green Fault LED amber ...

Страница 36: ...echnik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k03 4 2 Rear Side Figure 14 Rear side of the ETERNUS JX40 S2 1 I O module IOM 0 2 Cover 3 Mini SAS HD IN Port 4 Mini SAS HD OUT Port 5 Power supply unit PSU 0 6 Power supply unit PSU 1 3 4 1 6 5 2 ...

Страница 37: ...ED 3 SAS IN link LED 4 SAS OUT port 5 SAS OUT link LED 6 SAS OUT fault LED 7 Ready LED 8 Identify LED 9 Fault LED LED LED Status Meaning SAS IN link green The link between the SAS IN port and the source port has been established SAS IN fault amber not applicable SAS OUT link green The link between the SAS OUT port and the destination port has been established SAS OUT fault amber The link between t...

Страница 38: ...echnik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k03 Ready green The I O module is in normal status Identify blinks blue Identifies the installation location of the I O module Fault amber The I O module is in error status LED LED Status Meaning ...

Страница 39: ... of the ETERNUS JX40 S2 1 Power LED 2 Fault LED 3 AC missing LED 4 Fan fail LED 5 Power switch to power on and off the AC power supply 6 Inlet for connecting an AC power cord LED LED Status Meaning Power green AC power is supplied to the power supply unit Fault amber The power supply is in error status AC missing amber AC power is not supplied to this power supply unit but AC power is supplied to ...

Страница 40: ...ar Side Operating and Indicator Elements cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k03 This page intentionally is left blank for printing reasons ...

Страница 41: ...f this type of problems Store and transport hard disk drives only within the limits stipulated in the specification When transporting hard disk drives even over short distances always use the original packaging ESD labeling Never expose a hard disk drive to a temperature shock Avoid the formation of condensation inside and on the outside of the hard disk drives The hard disk drives may be exposed ...

Страница 42: ...ts ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k05 5 2 Removing Installing Hard Disk Drive Drive Dummy The hard disk drives which can be ordered for the ETERNUS JX40 S2 storage subsystem are delivered pre installed in frames Removing a hard disk drive from the frame may only be done in authorized repair centers Figure 17 2 5 hard disk drive in frame Figure 18 2 5 drive dummy ...

Страница 43: ... 5 hard disk drive in frame Figure 20 3 5 drive dummy Free bays are provided with a drive dummy which must be removed before fitting another hard disk drive I Keep a drive dummy for future use If you remove the hard disk drive again and do not fit a replacement you must put back the dummy drive because of cooling ...

Страница 44: ...21 Removing installing a 2 5 hard disk drive Figure 22 Removing installing a 3 5 hard disk drive Removing a hard disk drive Ê Check drive position in ServerView RAID and set the drive make offline Ê Press the green push button of the disk drive and open the lock lever Ê Hold the lock lever and pull the disk drive Installing a hard disk drive V CAUTION The hard disk drive must be acclimatized in it...

Страница 45: ...sk drive and open the lock lever see also figure 21 Ê During insertion of the disk drive hold it firmly with both hands in order not to cause any vibration or shock Ê Push the disk drive with the lever opened into the empty bay until it stops Ê Return the lock lever A clicking sound from it indicates that it is locked Temperature difference C operating environment outside Minimum acclimatization t...

Страница 46: ...alling Hard Disk Drive Drive Dummy Hard Disk Drives cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k05 This page intentionally is left blank for printing reasons ...

Страница 47: ...3 3 0 m SAS cable MiniSAS1 MiniSAS HD2 3 6 0 m Host connection with PSAS CP400e PRAID EP420e SAS cable MiniSAS HD2 MiniSAS HD2 3 2 5 m SAS cable MiniSAS HD2 MiniSAS HD2 3 3 5 m Cascading ETERNUS JX40 S2 subsystems SAS cable MiniSAS HD2 MiniSAS HD2 3 1 1 m SAS cable MiniSAS HD2 MiniSAS HD2 3 2 5 m 1 The external MiniSAS connector is compliant to SFF 8088 industry specification 2 The external MiniSA...

Страница 48: ...ction between the server and the storage subsystem by inserting the Mini SAS HD plug of the SAS cable coming from the server into the SAS IN port connector of the ETERNUS JX40 S2 storage subsystem I The cable tab must always be located at the lower side of the plug Figure 24 Orientation of the Mini SAS HD plugs Ensure that the plug engages securely to the SAS connector Only in this way can the flo...

Страница 49: ...to a safety socket on the rack power supply socket strip I Ensure that at least one power supply unit of the ETERNUS JX40 S2 storage subsystem and one power supply unit of the server attached to the subsystem are connected with the same phase In order to set up the power supply connection of the storage subsystem with phase redundancy the two power supply units must be connected to two different p...

Страница 50: ... cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k06 This page intentionally is left blank for printing reasons ...

Страница 51: ...CP400e or LSI SAS9200 8e 6Gb s 8ext PCIe FH LP SAS PRAID EP420e or LSI MegaRAID SAS 9286CV 8e SAS RAID 5 6 For detailed information on the supported configurations refer to the Fujitsu MatrixEP information data base at http ts fujitsu com matrixep 7 1 Basic RAID controller HBA configuration Figure 26 Basic RAID controller HBA configuration PRIMERGY server with RAID controller or host bus adapter E...

Страница 52: ... gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k07 7 2 RAID controller HBA configuration and maximal storage configuration Figure 27 RAID controller HBA configuration and up to 8 4 enclosures PRIMERGY server with RAID controller or host bus adapter ETERNUS JX40 S2 storage subsystem s with one I O module 2nd 4th shelf s optional 2nd 4th shelf s optional ...

Страница 53: ...e 7 3 RAID controller HBA configuration with two way storage 7 3 1 Host Bus Adapter Figure 28 Redundant host bus adapter and redundant I O module with two way storage configuration PRIMERGY server with two host bus adaptors ETERNUS JX40 S2 storage subsystem s with two I O modules 2nd 4th shelf s optional ...

Страница 54: ...fad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k07 7 4 Redundant controller and storage two way configuration Figure 29 Redundant HBA and redundant storage two way configuration PRIMERGY server with two dual host bus adapters ETERNUS JX40 S2 storage subsystem s with two I O modules 2nd 4th shelf s optional 2nd 4th shelf s optional ...

Страница 55: ...file sharing 7 5 Redundant controller and storage with file sharing Figure 30 Redundant HBA and redundant storage file sharing configuration PRIMERGY servers with two host bus adapters ETERNUS JX40 S2 storage subsystems with two I O modules 2nd 4th shelf s optional 2nd 4th shelf s optional ...

Страница 56: ...roller and storage with file sharing Configurations cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k07 This page intentionally is left blank for printing reasons ...

Страница 57: ... measures set out below Which are described in this chapter Which are described in the documentation for the connected server and the RAID controller or HBA used If you cannot rectify the fault proceed as follows Ê Note the steps that you have performed and the state which was active when the error occurred Note also any error message which may have been displayed Ê Contact our service organizatio...

Страница 58: ...able of eliminating the malfunction by advice via phone 8 1 1 Identification LED Front 8 1 1 1 Identification status LED is on ServerView switched on this LED for identification No error 8 1 2 Fault LED Front 8 1 2 1 Fault LED is on during operation Ê Hardware error detected on ServerView detected a fault blinking or on check ServerView for service action Ê Check the Error LEDs of the build in com...

Страница 59: ...ms indicated by them If the fault LED amber LED on a IOM is on the IOM is defective Ê Before you replace the defective IOM please contact the Fujitsu Service Desk first For more information refer to section I O Module on page 37 8 1 5 Temperature Sensor Error Message Temperature too high The temperature sensors have measured an extreme temperature tolerable temperature for operation see section Te...

Страница 60: ...15 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k09 8 1 7 The ETERNUS JX40 S2 does not Power on with the Attached Server Ê The PSU power switches must be set to ON Incorrect cabling Ê Ensure that the SAS cabling is correct SAS IN port the ETERNUS JX40 S2 is powered on by SAS link from the Server ...

Страница 61: ... page 57 I See Hard Disk Drives on page 41 for replacing hard disk drives 9 1 Power Supply Unit The power supply units are supplied with mains voltage via the supplied connecting leads The power supply units can be connected to two different phases of the in house circuit in order to achieve phase redundancy see section Power Supply Connection on page 49 The ETERNUS JX40 S2 has two power supply un...

Страница 62: ...se the latch of the ejector lever on both sides using both hands and pull the unit out halfway Ê Take the power supply unit out of the bay while supporting its bottom To install the power supply unit follow the above steps in reverse Ê Push the new power supply unit into the empty bay halfway while supporting its bottom Ê Open the ejector levers and insert the power supply unit Then press the leve...

Страница 63: ...y Ê Remove the SAS cables after keeping a record for correct reconnecting Figure 32 Removing the I O module Ê Release the latch of ejector lever on both sides with fingers of both hands and pull the I O module out halfway Ê Take the I O module out of the bay while supporting its bottom To install the I O module follow the above steps in reverse Ê If the IN link LED for the replaced I O module rema...

Страница 64: ...t the rear of the storage subsystem switch off the power supply units using their power switches Ê Remove the AC cord clamps and remove the leads Ê Remove the flange cover capping the operation panel I Record the slot positions of the disks to be removed in the next step Ê Remove some disks nearest to the operation panel in order to have free mounting place for unscrewing the operation panel Figur...

Страница 65: ...eration Panel Figure 34 Screw to be loosened for removing the 3 5 operation panel Ê Loosen the screw holding the operation panel Ê Carefully take off the operation panel for some millimeters Figure 35 Ribbon cable connecting the operation panel Operation panel ...

Страница 66: ...ellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en k04 Ê Remove the ribbon cable connecting the operation panel Ê Mont the new operation panel in reverse order I Install the disks as recorded when you removed them ...

Страница 67: ...sted here are valid for the described device AC Alternating Current ACPI Advanced Configuration and Power management Interface ANSI American National Standard Institute ASR R Automatic Server Reconfiguration and Restart ATA Advanced Technology Attachment BBU Battery Backup Unit BIOS Basic Input Output System BMC Baseboard Management Controller CC Cache Coherency CHS Cylinder Head Sector CMOS Compl...

Страница 68: ...Communication CPU Central Processing Unit DC Direct Current DIMM Dual Inline Memory Module DIP Dual Inline Package DMA Direct Memory Access DMI Desktop Management Interface DRAM Dynamic Random Access Memory ECC Error Checking and Correcting EFI Extensible Firmware Interface EMC Electromagnetic Compatibility EMI Electromagnetic interference EMP Emergency Management Port EMRL Embedded RAID Logic ...

Страница 69: ... EVRD Enterprise VRD FPC Front Panel Controller FRU Field Replaceable Unit FSB Front Side Bus GUI Graphical User Interface HBA Host Bus Adapter HDD Hard Disk Drive HPC Hot plug Controller HSC Hot swap Controller I C Inter Integrated Circuit I O Input Output ICM Intelligent Chassis Management ID Identification ...

Страница 70: ...cs IEC International Electrotechnical Commission IME Integrated Mirroring Enhanced IPMB Intelligent Platform Management Bus IPMI Intelligent Platform Management Interface iRMC integrated Remote Management Controller IRQ Interrupt Request Line LAN Local Area Network LBA Logical Block Address LCD Liquid Crystal Display LUN Logical Unit Number LVD Low Voltage Differential SAS MMF Multi Mode Fiber MRL...

Страница 71: ...OS Operating System PCI Peripheral Component Interconnect PDA Prefailure Detection and Analyzing PDB Power Distribution Board PIO Programmed Input Output PLD Programmable Logic Device POST Power On Self Test PS U Power Supply Unit RAID Redundant Arrays of Independent Disks RoHS Restriction of the Use of Certain Hazardous Substances Waste from Electric and Electronic Equipment EU guideline ...

Страница 72: ...RoMB RAID on Motherboard RSB RemoteView Service Board RST ReSeT RTC Real Time Clock RTDS Remote Test and Diagnostics System SAF TE SCSI Accessed Fault Tolerance Enclosures SAS Serial Attached SCSI SATA Serial ATA SBE Single Bit Error SCA Single Connector Attachment SCSI Small Computer System Interface SDR Sensor Data Record SDRAM Synchronous Dynamic Random Access Memory SEL System Event Log ...

Страница 73: ...upt SMM Server Management Mode SMP Symmetrical Multi Processing SSD Solid State Disk SSU System Setup Utility SVGA Super Video Graphics Adapter UHCI Unified Host Controller Interface USB Universal Serial Bus WEEE Waste from Electric and Electronic Equipment EU directive WfM Wired for Management WOL Wake up On LAN ...

Страница 74: ...NUS JX40 S2 Abbreviations cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en abk This page intentionally is left blank for printing reasons ...

Страница 75: ...left support upright as example 30 Figure 8 Fastening the 2 5 subsystem 30 Figure 9 Fastening the 3 5 subsystem 30 Figure 10 Front of the ETERNUS JX40 S2 2 5 disk slot numbering below 33 Figure 11 Front of the ETERNUS JX40 S2 3 5 disk slot numbering below 33 Figure 12 Operation panel 34 Figure 13 Disk LEDs 35 Figure 14 Rear side of the ETERNUS JX40 S2 36 Figure 15 I O module of the ETERNUS JX40 S2...

Страница 76: ...26 Basic RAID controller HBA configuration 51 Figure 27 RAID controller HBA configuration and up to 8 4 enclosures 52 Figure 28 Redundant host bus adapter and redundant I O module with two way storage configuration 53 Figure 29 Redundant HBA and redundant storage two way configuration 54 Figure 30 Redundant HBA and redundant storage file sharing configuration 55 Figure 31 Ejector levers of a power...

Страница 77: ...ETERNUS JX40 S2 Operating Manual 77 Tables Tables Table 1 Notation conventions 12 Table 2 Acclimatization time for the hard disk drives 45 ...

Страница 78: ...78 Operating Manual ETERNUS JX40 S2 Tables cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en tvz ...

Страница 79: ...of charge as PDF files from the Internet The overview page showing the online documentation available on the Internet can be found via the URL http manuals ts fujitsu com For the documentation of the PRIMERGY servers and of the PRIMERGY ServerView Suite choose the navigation point X86 Servers 1 Safety notes and other important information 2 Ergonomics 3 Guarantee 4 Returning used devices 5 PRIMECE...

Страница 80: ...80 Operating Manual ETERNUS JX40 S2 Related publications cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en lit ...

Страница 81: ...O module add 63 replace 63 L labels 21 low voltage directive 18 M manufacturer s notes 18 MatrixEP 51 O on off switch 33 operation panel LED status 34 replacing 64 P packaging 20 phase redundancy 49 power on failure 60 power supply connection 49 power supply status LED dark 58 power supply unit add 61 redundancy 61 replace 61 R radio suppression 18 recycling devices 21 replacing I O module 63 oper...

Страница 82: ...82 Operating Manual ETERNUS JX40 S2 Index cognitas Gesellschft für Technik Dokumentation mbH 2015 Pfad C Users gudat Documents ______FTS _STORAGE JX40_S2 FM sx40 ba en sx40 ba en six ...

Отзывы: