;
7" Round Horizontal Ducting
NOTE: Provide the ducting and electrical cutouts within the shaded area
(FDR-4200D only).
23-5/8"
21-5/8"
15"
11-13/16"
18-1/8"
16-15/16"
1-3/16"
HOOD MOUNTING
SCREWS (4)
FRONT OF HOOD
BRACKET MOUNTING
SCREWS (2)
13-3/4"
DUCT COVER WIDTH
DUCT COVER HEIGHT
19-11/16"
15-3/4"
3
Run house wiring between service panel and hood location.
4
Prepare the range hood.
(1) Remove the oil receiving cover
Hold both ends of the oil receiving
cover with your hands and lift it up to
detach from the body.
(2) Remove the Rectifier Baffle Panel
Loosen the screws fixing the Rectifier
Baffle Panel, then slide the panel
upward to dislocate the temporary
fixing holes and disengage from the
catches of the body.
Oil receiving cover
Temporary
fixing hole
Catch
Rectifier Baffle Panel
7