13-19
13.1 Distribution Entrance Unit
13
Removal
1. Remove the distribution entrance unit
.
2. Remove the screw securing the cable end and
hook the cable as shown.
3. Remove the two guide plate fulcrum screws using
a 2.5mm hexagonal wrench.
4. Unhook the cable, remove the four screws and
open the lower guide plate.
13.1.15
Feed Roller Replacement
LII498
Screw
Cable
LII1158
Guide Plate Fulcrum Screws (2)
LII511
Cable
Screws (4)
Lower Guide Plate