Fuji Electric OPC-VG1-ESX Скачать руководство пользователя страница 11

- 3 - 

 

 

•  Prevent lint, paper fibers, sawdust, dust, metallic chips, or other foreign materials from getting into the inverter 

and the interface card. 

 

Otherwise, a fire or an accident might result. 

•  Incorrect handling in installation/removal jobs could cause a failure. 
 

A failure might result. 

 

Operation 

 

•  Be  sure  to  mount  the  front  cover  before  turning  the  power  ON.  Do  not  remove  the  cover  when  the  inverter 

power is ON. 

  Otherwise, an electric shock could occur. 

•  Do not operate switches with wet hands. 

  Doing so could cause an electric shock.   

•  If  you  configure  the  function  codes  wrongly  or  without  completely  understanding  the  FRENIC-VG  Instruction 

Manual  and  User's  Manual,  the  motor  may  rotate  with  a  torque  or  at  a  speed  not  permitted  for  the machine. 
Confirm and adjust the setting of the function codes before running the inverter. 

  Otherwise, an accident could occur. 

•  When enabling the communications link (H30), be sure to check that a run command entered via the ESX bus 

or  digital  input  terminals  is  OFF  beforehand.  Enabling  it  with  the  run  command  being  ON  causes  a  sudden 
motor start. 

•  When resetting an alarm, be sure to check that a run command entered via the ESX bus is OFF beforehand. 

Resetting it with the run command being ON causes a sudden motor start. 

•  If a communications error occurs when the inverter is controlled via the ESX bus, it may cause the inverter to 

fail to recognize a stop command via the ESX bus. Make an emergency stop measure using 

BX

 ("Coast to a 

top") or 

STOP1

STOP2

STOP3

 ("Decelerate to stop") assigned to inverter digital input terminals. 

•  If "Communications error processing" (y02, y12) is set to "Continue to run" or "Retry and continue to run," the 

inverter may automatically start running after recovery from errors. 

 

Otherwise, an accident could occur.

 

 

Maintenance and inspection, and parts replacement 

 

 

•  Before proceeding to the maintenance/inspection jobs, 

turn OFF the power and wait at least five minutes for 

inverters of 22 kW or below, or at least ten minutes for those of 30 kW or above

. Make sure that the LED 

monitor and charging lamp are turned OFF. Further, make sure, using a multimeter or a similar instrument, that 
the DC link bus voltage between the terminals P(+) and N(-) has dropped to the safe level (+25 VDC or below). 

  Otherwise, an electric shock could occur. 

•  Maintenance, inspection, and parts replacement should be made only by qualified persons. 
•  Take off the watch, rings and other metallic objects before starting work. 
•  Use insulated tools. 
•  Never modify the interface card. 

  Otherwise, an electric shock or injuries could occur. 

 

Disposal 

 

•  Treat the interface card as an industrial waste when disposing of it.   
 

Otherwise injuries could occur.

 

 

Others 

 

•  Never modify the interface card. 

  Doing so could cause an electric shock or injuries.

 

 

Содержание OPC-VG1-ESX

Страница 1: ...1 FRENIC VG ESX OPC VG1 ESX FRENIC VG ESX ESX FRENIC VG INR SI47 1602 JE...

Страница 2: ...2 ESX OPC VG1 ESX FRENIC VG MICREX SX FRENIC VG FRENIC VG D port MICREX SX FRENIC VG OPC VG1 ESX FRENIC VG FRENIC VG 22kW 30kW 10 LED P N DC 25V...

Страница 3: ...3 ESX ESX ESX ESX BX STOP1 STOP2 STOP3 22kW 30kW 10 LED P N DC 25V...

Страница 4: ...4 1 1 1 1 OPC VG1 ESX 2 3 M3 3 3 1 2 1 2 1...

Страница 5: ...5 1 3 1 3 1 1 3 1 1 25 70 5 95 2 0 01 mg cm2 86 106 kPa 70 106 kPa 1 2 1 2 1 3 1 3 1 3 2 1 2 70 3 1 3 1 1 3 3 1 2...

Страница 6: ...6 2 2 1 CHARGE OFF 30A 30B 30C Y5A Y5C OFF FRN22VG1S 2J 4J 22kW FRN30VG1S 2J 4J 30kW 2 1 1 a 1 2 1 2 b 2 2 1 1 FRN22VG1S 2J 4J 22kW 2 1 2 FRN30VG1S 2J 4J 30kW a b...

Страница 7: ...7 2 2 1 CN1 D port 2 a 2 b 4 3 2 1 1 2 1 2 2 2 1...

Страница 8: ...8 2011 11 141 0032 11 2 URL http www fujielectric co jp 513 8633 5520 2011 11...

Страница 9: ...andling might result in incorrect operation a short life or even a failure of this product Deliver this manual to the end user of this product Keep this manual in a safe place until this product is di...

Страница 10: ...with installation connections wiring operation or maintenance and inspection Ensure you have sound knowledge of the device and familiarize yourself with all safety information and precautions before p...

Страница 11: ...s error occurs when the inverter is controlled via the ESX bus it may cause the inverter to fail to recognize a stop command via the ESX bus Make an emergency stop measure using BX Coast to a top or S...

Страница 12: ...del printed on the interface card Model OPC VG1 ESX 2 The interface card is not damaged during transportation 3 The following accessories are also contained in the package Three screws M3 Three spacer...

Страница 13: ...the interface card in an airtight vinyl sheet or the like for storage 3 If the interface card is to be stored in a high humidity environment put a drying agent such as silica gel in the airtight pack...

Страница 14: ...tion of electric shock Shut down the power of the external equipment for prevention of electric shock Remove the front cover from the inverter as shown below The removal procedure differs depending on...

Страница 15: ...so that connector CN1 on the card comes to be connected to connector D port on the control PCB 2 Secure the interface card with two screws a that come with the option through holes and then set four s...

Страница 16: ...mprovement The purpose of this instruction manual is to provide accurate information in handling setting up and operating of the ESX bus interface card Please feel free to send your comments regarding...

Отзывы: