![Fuji Electric OPC-PRT Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/fuji-electric/opc-prt/opc-prt_instruction-manual_2341941045.webp)
44
At times, it may be convenient to zoom in on a particular gauge or meter in order to more
clearly see the indicator, or to fill the computer screen with a particular gauge’s image.
This can be easily accomplished with the web browser’s Flash Player plug-in by right-
clicking on the gauge and selecting the desired zoom level (refer to Figure 33).
Figure 33: Zooming
6.3.5 Submitting Changes
Whenever any of the gauge window configuration items
in the Dashboard Tab have been changed, the “submit”
button located on the right-hand portion of the web page
must be selected in order to write these settings to the
interface card’s file system. Refer to Figure 34. Note that
submitting the Dashboard Tab configuration does not
require rebooting of the interface card: the changes take
effect immediately, and the interface card continues its
operation without interruption.
Figure 34: Submit Dashboard Changes
Содержание OPC-PRT
Страница 18: ...17 Figure 5 Installation for 15 kW and Smaller Inverters Interface Card Connector Board Option Case...
Страница 19: ...18 Figure 6 Installation for 18 5 kW to 22 kW Inverters Interface Card Connector Board Option Case...
Страница 86: ...85 Figure 85 Monitoring the Data Being Read from the Inverter...
Страница 116: ...47520 Westinghouse Dr Fremont CA 94539 Tel 510 440 1060 Fax 510 440 1063 http www americas fujielectric com...