24/28
22
Please users according to the actual needs,to choose a Option or Option
Anti-pour, choose one of the options to install,as shown.
Option
Please use a pen to locate the
pour-proof position on the wall,
guide the hole position with an
impact rotation, then use a
hammer to knock (N-1) against
the wall, and use screws (N-2)
to pass through plate 5 and Plate
9 and Plate 12 to lock with the
wall,as shown.
drilling hole
Ø6x30mm
WALL
WALL
x2
N-1
x2
x2
WALL
WALL
N-2
N-2
N-2
N-1
N-1
5
17
18
21
Option
Please use the screw (M-2) to pass
through the cloth strip (M-1) and
lock it with Plate 2 and Plate 4
respectively,as shown.
2
4
1
2
M-1
M-2
4
9
10
11
12
M-1
M-2
Nx2
Mx2
Ø6x30mm Ø4x40mm
Ø4x14mm
M-1
M-2
N-2
N-1