background image

Installing

1. Locate tip you want to install and look at the threaded end. This screw acts as a "key" and is already 

mounded with the key channel. Do not try to screw the key channel off from the threaded key, which 

might destroy the whole probe.

2. Slightly screw the key that you need onto the key channel.

4-pin Connector

Power Connector

Brightness Control

Barrel Assembly

Hand Knob

Focus Control

Coil Cable

25-U-M

Содержание FFOI-605

Страница 1: ...250X FIBER OPTIC INSPECTION PROBE MICROSCOPE FFOI 605 Quick Start Guide V1 0 Microscope Displays Hand held Fiber Power...

Страница 2: ...inspect hard to reach connectors that are installed on the backside of patch panels or inside hardware devices It eliminates the need to access the backside of patch panels or disassemble hardware dev...

Страница 3: ...bulkhead LC UPC bulkhead SC APC bulkhead FC APC bulkhead LC APC bulkhead Adapter Type Description 25 U M 2 5mm UPC Male 125 U M 1 25mm UPC Male 25 A M 2 5mm APC Male 125 A M 1 25mm APC Male FC PC F FC...

Страница 4: ...already mounded with the key channel Do not try to screw the key channel off from the threaded key which might destroy the whole probe 2 Slightly screw the key that you need onto the key channel 4 pi...

Страница 5: ...ay with probe connect the probe to the display Step 1 Connect the cable from the probe to the monitor using the 4 pin connector on the bottom of the monitor Step 2 Connect the AC power adapter charger...

Страница 6: ...or charge the battery pack Both can be accomplished simultaneously Refers to a potential product hazard it requires a procedure which if not correctly followed may result in component damage Do not pr...

Страница 7: ...m the day you receive your goods Warranty All Fiber Optic Inspections enjoy 1 year limited warranty against defect in materials or workmanship For more details about warranty please check at https www...

Отзывы: