LAN
/1G
/PoE
ole
48V
2.5
G S
FP
2.5G
SFP
K
K
Console
48V
Reset
2.5G SFP
2.5G SFP
LAN/1G/PoE
NOTE:
1. Connect the Ethernet cable before mounting the AP on the bracket.
2. The AP should be pushed into the buckle holes smoothly.
3. After mounting, check whether the AP is fixed.
4. The steps of wall mount are the same as the ceiling mount.
Installing the Optical Transceiver Module
1. Insert the module into the SFP port.
7
EN
4. Align the buckles behind the AP with the buckle holes of the mounting bracket and push the AP
into the holes in the opposite direction of the arrow to fix.