ASSEMBLY
OM 0408SB1174-A
24
Figure 21
Figure 21A
Diagram
Installation of Electric Deflector Kit 5RDF0021
(Figures 21 to 24 & Electrical Diagram)
PRE-ASSEMBLY
1. Figure 21A:
Install the clevis with the 1 1/32"
diam. hole (item
1) on the actuator base
(item 2), and the one with the 1 5/32" diam.
hole (item 3) on the other end and attach
using two 1/2" NC x 2 1/2" bolts and two 1/2"
NC nylon insert locknuts (items 4-5).
2. Figure 21A:
Install a 3/16" x 1 3/4" spring pin
(item 6) on each 1" pin (item 7).
3. Figure 21 & diagram:
Connect the wires to
the switch as follows:
•
72" black ground wire (item 1) to terminal
"C" (see diagram).
•
72" red fuse wire (item 3) to terminal "B
(see diagram).
•
360" red and black actuator wires (item 4)
to terminal "A" and "D" (see diagram).
Содержание SB1174
Страница 1: ...OM 0408SB1174 A 09 11 Serial 1XFSB11X_B0111288 up OPERATOR S MANUAL SNOWBLOWERS SB1174...
Страница 2: ......
Страница 43: ...PARTS OM 0408SB1174 A 41 SNOWBLOWER SB1174...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ...All Rights Reserved PART NO 5RDO4081174A...