Page
3
of
4
Step-4
Fix Aluminum handle in the front and tighten this clockwise with screw and Allen key as shown in the image.
Step-5
Place the mesh bag from the top and fix each snap button on all the four side and attach Velcro on all the four pipe
as shown in the image.