Fronius Wattpilot Go 11 J 2.0 Скачать руководство пользователя страница 1

Operating

Instructions

Fronius Wattpilot

Go 11 J 2.0 / 22 J 2.0
Go 22 J 2.0 AUS
Home 11 J 2.0 / 22 J 2.0

42,0426,0435,EN

003-08092022

EN

Operating instructions

Содержание Wattpilot Go 11 J 2.0

Страница 1: ...Operating Instructions Fronius Wattpilot Go 11 J 2 0 22 J 2 0 Go 22 J 2 0 AUS Home 11 J 2 0 22 J 2 0 42 0426 0435 EN 003 08092022 EN Operating instructions...

Страница 2: ......

Страница 3: ...ns 22 Overview 22 Phase changeover 22 PV surplus 22 Flexible electricity tariff 25 Different charging modes 26 Standard mode 26 Eco Mode 26 Next Trip Mode 27 Installation and commissioning 31 Installa...

Страница 4: ...hips 53 Password 53 Grid settings 54 Internet 55 Connection 55 OCPP 55 Restart 55 Firmware update 56 Appendix 57 General 59 Residual current detection 59 Safety functions 59 Standard settings 59 Techn...

Страница 5: ...General information 5...

Страница 6: ...6...

Страница 7: ...age to the device and other material assets belonging to the operating company All personnel involved in commissioning maintenance and servicing of the device must Be suitably qualified Have knowledge...

Страница 8: ...air work must only be carried out by an authorised special ist EMC measures In certain cases even though a device complies with the standard limit values for emissions it may affect the application ar...

Страница 9: ...The manufacturer shall not be liable for any damage resulting from such use All warranty claims will be forfeited Symbols on the device The symbols on the Fronius Wattpilot must not be removed or pain...

Страница 10: ...incl screws and dowels 2 Wattpilot Home 11 J 2 0 or Wattpilot Home 22 J 2 0 3 Anti theft device 4 Reset card 5 ID chip 6 Quick Guide Accessories NOTE Only use original adapters for the operation of t...

Страница 11: ...6 blue 2 0 1 phase 4 240 412 Adapter Go 22 type F plug 2 0 household socket 4 240 413 Safety WARNING Danger due to incorrect operation and incorrectly performed work This can result in serious injury...

Страница 12: ...sage can result in severe personal injury and damage to property Only mount the device vertically Dry wet connectors in a de energised state Clean soiled connectors in a de energised state WARNING Dan...

Страница 13: ...that may result The device has a built in residual current protection module with residual current detection 20 mA AC and 6 mA DC This means that no upstream type B resid ual current circuit breaker i...

Страница 14: ...y with external generators is that no other self con sumption controllers with e g battery power to heat are operated in parallel This can lead to photovoltaics optimisation PV optimisation malfunctio...

Страница 15: ...he second LED lights up white Card reader Behind the symbol is the card reader for reading ID chips and the reset card The card reader uses RFID radio frequency identification RFID is the transmit ter...

Страница 16: ...scanning the supplied ID chip or by providing confirmation in the app To scan hold the ID chip directly in front of the card reader of the Wattpilot Each ID chip can be assigned a name in the app und...

Страница 17: ...on page 67 Next Trip Mode The Wattpilot is in Next Trip Mode The second LED lights up white The second LED flashes orange see chapter Status Codes on page 67 The second LED flashes red see chapter St...

Страница 18: ...the car A few yellow LEDs light up when the charging cur rent is low Several all yellow LEDs light up when the charging current is high 1 phase charging The Wattpilot is carrying out 1 phase 230 V ch...

Страница 19: ...communication fault The Wattpilot displays an internal communication error The error code is displayed in the app For more informa tion see Status Codes on page 67 All LEDs flash red Residual current...

Страница 20: ...as failed The unlocking or locking attempt is repeated at 5 second intervals For more in formation see Status Codes on page 67 The LEDs light up red at the top and yellow at the bottom for 1 second Ch...

Страница 21: ...Reset card detected The Wattpilot has detected the reset card and the set tings are reset All LEDs light up red for 2 seconds 21 EN...

Страница 22: ...phase load imbalance Select the phase changeover point in such a way that the maximum permissible phase load imbalance is not exceeded PV surplus NOTE A minimum charging time of 5 minutes is stored T...

Страница 23: ...harging power for 1 phase and 3 phase charging in kilowatts kW 1 phase in 0 23 kW in crements 3 phase in 0 69 kW increments The values are based on the assump tion that the voltage is exactly 230 or 4...

Страница 24: ...a temperature sensor is connected to the Ohmpilot To set the Wattpilot priority the energy management priority settings on the user interface of the in verter must also be taken into account NOTE If...

Страница 25: ...the Fronius inverter must not be used for load management of the Wattpilot The priorities of the loads are not clearly assigned Flexible electri city tariff The flexible electricity tariff can be used...

Страница 26: ...ow cost electricity is available Charging can either take place with cheaply purchased electricity see Flexible electricity tariff on page 25 or surplus energy produced by the photovoltaic sys tem see...

Страница 27: ...e defined price limit The electric vehicle is charged with cheap electricity during this period Charging in Eco Mode PV surplus Price limit Wattpilot No No No charging No Yes Max charging Yes No Charg...

Страница 28: ...ctricity tariff is activated If the flexible electricity tariff is activated in Next Trip Mode and there is no con nection to the electricity provider s data the Next Trip Mode LED flashes red Chargin...

Страница 29: ...plugged in and charged at approximately 15 00 If PV surplus is available charging is carried out with PV surplus The re maining charging amount is guaranteed to be charged in the electric vehicle at t...

Страница 30: ...30...

Страница 31: ...Installation and commissioning 31...

Страница 32: ...32...

Страница 33: ...g of the mounting bracket on uneven surfaces An uneven surface can cause the mounting bracket to warp making it impossible to attach the Wattpilot Select a suitable location on an even surface Install...

Страница 34: ...NOTE The type 2 plug is not waterproof Water can penetrate when the Wattpilot is mounted horizontally Mount the Wattpilot vertically 34...

Страница 35: ...it is not warped or deformed The following illustrations may differ slightly from the actual product the Watt pilot Home 11 J 2 0 Home 22 J 2 0 does not have a mains plug 1 Mark the drill holes 4 time...

Страница 36: ...material and the padlock are not included Use appropriate fasten ing materials depending on the substrate The installer is responsible for select ing the right type of fixing 1 Mount the anti theft pr...

Страница 37: ...3 Mount the anti theft protection using suitable mounting material 4 Secure the Wattpilot with a padlock 37 EN...

Страница 38: ...o the grid operator Installing the Wattpilot Home When installing the Wattpilot Home 11 J 2 0 or Home 22 J 2 0 the mains cable must be installed by a qualified person in accordance with national stand...

Страница 39: ...rrent of one phase is exceeded as a result the inverter switches off the backup power The electric vehicle must be unplugged and the backup power acknowledged see inverter Operating Instructions IMPOR...

Страница 40: ...charging process prematurely In the vehicle via the cable release function In the app by clicking on Stop see chapter Homepage on page 47 NOTE The way in which the cable is released can be configured...

Страница 41: ...verters on page 13 The Wattpilot and the inverter are in the same network A primary Fronius Smart Meter at the feed in point must be connected to the inverter If there are several inverters with prima...

Страница 42: ...42...

Страница 43: ...Fronius Solar wattpilot app 43...

Страница 44: ...44...

Страница 45: ...se and update the Wattpilot The app is available for Android and iOS You can access the Wattpilot via the app as follows Directly see Setting up the WLAN on page 46 Via Internet see Setting up the WLA...

Страница 46: ...eset card of the Wattpilot 2 Follow the further instructions in the app NOTE The selected WLAN of the Wattpilot must remain connected despite the ab sence of an Internet connection for end devices wit...

Страница 47: ...g the icon 2 Views in the main window Power Details Forecast 3 Power The current charging current and the charging time are dis played Touch circle Charging is started stopped Touch buttons below Call...

Страница 48: ...te and time from which the charging cable is connected End End date and time when the charging cable is disconnected Total duration Period of time during which the Wattpilot is in use Duration of acti...

Страница 49: ...nsumption over 100 km varies from vehicle to vehicle and can be adjusted under Con sumption over 100 km 3 Enter the time by which charging must be complete Activating Next Trip Mode Directly on the Wa...

Страница 50: ...wly increase PV surplus advanced settings In the advanced settings a start up power level can be set from which the PV energy is used for charging Vehicles require a certain minimum power in order to...

Страница 51: ...the Wattpilot immediately starts 3 phase charging Only 1 phase There is 1 phase available for charging Only 3 phase There are 3 phases available for charging 3 phase power level Set a power level tha...

Страница 52: ...ID chip Scan the ID chip 1 Hold the ID chip in front of the card reader on the Wattpilot 2 Five LEDs light up green Charging starts Lock mode selection Set whether the pushbutton on the Wattpilot shou...

Страница 53: ...o deactivate the earthing test in insulated grids in some countries e g Norway ID chips Up to 10 ID chips can be used The ID chip is used for authentication and for re cording user specific charging a...

Страница 54: ...ust the maximum charging current of the Wattpilot Higher charging currents can no longer be selected NOTE PV optimisation works best when the maximum charging current is set as high as the maximum all...

Страница 55: ...ystem via which for example load distribution of an infrastructure or billing can be carried out It can be set up via a remote server provider or locally Activate OCPP Activation or deactivation of OC...

Страница 56: ...ersion is installed and whether an update is avail able Firmware update 1 Click on Update available 2 Click on Update 3 After a firmware update check whether the Fronius Solar wattpilot app also needs...

Страница 57: ...Appendix 57...

Страница 58: ...58...

Страница 59: ...etection 20 mAAC 6 mADC Phase and voltage testing of the input voltage Auxiliary contact on the relays for checking the switching function Earthing detection can be switched off Norway mode Current se...

Страница 60: ...0 kWh Until time 06 00 Eco Mode after Next Trip Mode On Consumption over 100 km 18 kWh Cost optimisation Go 11 J 2 0 Home 11 J 2 0 Go 22 J 2 0 Go 22 J 2 0 AUS Home 22 J 2 0 Use Lumina Strom aWattar Of...

Страница 61: ...2 0 Home 11 J 2 0 Go 22 J 2 0 Go 22 J 2 0 AUS Home 22 J 2 0 Brightness Max Switch off LEDs after 10 s in standby Off LED colours Go 11 J 2 0 Home 11 J 2 0 Go 22 J 2 0 Go 22 J 2 0 AUS Home 22 J 2 0 Re...

Страница 62: ...ase of power failure Off Earthing control Go 11 J 2 0 Home 11 J 2 0 Go 22 J 2 0 Go 22 J 2 0 AUS Home 22 J 2 0 Earthing control Activated Additional settings Go 11 J 2 0 Home 11 J 2 0 Go 22 J 2 0 Go 22...

Страница 63: ...ice 20 mAAC 6 mADC Supply line cable cross section Min 2 5 mm2 RFID radio frequency identification 13 56 MHz WLAN IEEE 802 11b g n 2 4 GHz Supported safety standards WEP WPA WPA2 WPA3 Safety class IP...

Страница 64: ...esistance IK08 Dimensions width x height x depth 155 x 287 x 109 mm Weight 2 kg Use Indoors and outdoors No direct sunlight Installation type Suspended Ambient temperature 25 to 40 C Average ambient t...

Страница 65: ...sea level 0 2 000 m Wattpi lot Home 11 J 2 0 Fronius Wattpilot technical data Home 11 J 2 0 Max charging power 11 kW Mains supply types TT TN IT Mains connection 5 pin cable Nominal voltage 230 and 2...

Страница 66: ...rable 6 32 A 1 phase or 3 phase Grid frequency 50 Hz Power consumption in standby 1 9 W LED dark 4 2 W LED bright Charging socket Type 2 infrastructure socket with mechanical lock Residual current dev...

Страница 67: ...Ds at the top flash red The device is only being supplied with 2 phases Make sure that phase 2 and phase 3 are connected correctly Option a supply via phase 1 only is possible Cause Remedy 8 Grounding...

Страница 68: ...onnect device and allow to cool down Incorrectly installed cables Disconnect device and allow to cool down Cause Remedy Cause Remedy 105 No data available on the flexible electricity tariff first or s...

Страница 69: ...ing detected Check vehicle cable and fit of charging plugs Cause Remedy No LEDs light up after plugging in No power on the junction box Check the overload fuse of the connection Miniature fuse defecti...

Страница 70: ...ccordance with the European Dir ective and national legislation Used equipment must be returned to the distrib utor or disposed of via an approved local collection and disposal facility Correct dispos...

Страница 71: ...71 EN...

Страница 72: ......