71
EN
-U
S
Connect TWIN Controller
Connect the TWIN
Controller with
the Power Sourc
-
es and Connect
Interconnecting
Hosepack
1
Connecting power source to the TWIN Con
-
troller via SpeedNet cable
TPSi 1 = power source 1
TPSi 2 = power source 2
HP CON 1 = interconnecting hosepack 1
HP CON 2 = interconnecting hosepack 2
Connecting TWIN
Controller to the
Robot Controls
1
R-C = robot controls
1
1
2
2
3
3
4
4
TPSi 1
TPSi 2
HP
CON 1
HP
CON 2
1
1
1
R-C
1
Содержание TPS/i Robotics TWIN Push
Страница 2: ...2...
Страница 6: ...6...
Страница 18: ...18...
Страница 19: ...General Information...
Страница 20: ......
Страница 38: ...38...
Страница 39: ...Welding Technology Aspects...
Страница 40: ......
Страница 52: ...52...
Страница 53: ...Operating controls connections and mechanical components...
Страница 54: ......
Страница 59: ...59 EN US 4 Dummy cover 5 Dummy cover...
Страница 61: ...Installation and Startup...
Страница 62: ......
Страница 76: ...76 Prepare torch body with steel inner liner 1 2 3 4 5 6 1 2 3 4 5 6...
Страница 77: ...77 EN US 7 8 9 10 11 12 7 8 9 10 11 12...
Страница 80: ...80 5 6 1 2 4 1 5...
Страница 87: ...Troubleshooting Maintenance and Disposal...
Страница 88: ......
Страница 95: ...Technical Data...
Страница 96: ......
Страница 105: ...105 EN US...
Страница 106: ...106...
Страница 107: ...107 EN US...