Fronius Symo Hybrid 3.0 Скачать руководство пользователя страница 38

ATTENTION! ?

Danger of deep discharge of an unactivated battery

This may result in permanent damage to the battery.

The Solar Web wizard needs to be run in order to activate the battery and, if neces-
sary, the Smart Meter.

5

Run the Solar Web wizard and follow the instructions

The Fronius Solar.web homepage
or
the Fronius system monitoring web page is displayed.

Information to
help you work
through the Solar
Web wizard

The solar web wizard consists of 5 steps:

1. General

General system data (e.g. system name) is entered here

2. Service password

Enter (and make a note of) the service password

3. IO assignment

Settings for the IO interface are entered (see also "Fronius Energy Package - IO assign-
ment" Operating Instructions)

4. System overview

Settings for the entire PV system are entered (see also "Fronius Energy Package - Sys-
tem overview" Operating Instructions)

5. Dynamic power

Settings for dynamic power reduction are entered (see also "Fronius Energy Package -
Dynamic power reduction" Operating Instructions)

Once you have worked your way through the Solar Web wizard, an automatic process is
triggered to calibrate all the components. This involves charging the Fronius Solar Bat-
tery fully. After that, the system automatically starts in the set operating mode.
This calibration charging process is also performed automatically during actual operation
after a number of charging and discharging cycles. When this calibration charge is per-
formed depends on a number of different factors, such as the average state of charge or
the energy throughput through the battery. The time can therefore vary depending on the
time of year as well.

If the "permit battery charging from PSC grid" setting is deactivated, this calibration char-
ging process relies exclusively on energy from the photovoltaic system when operating
under normal conditions. Depending on the insolation conditions and size of the systems
concerned, the charging process can take a very long time.
If the "permit battery charging from PSC grid" setting is activated, the calibration charging
process is performed by drawing a constant current from the photovoltaic system and
DSO (distribution system operator) grid.

IMPORTANT!

 The automatic process for fully charging the battery may result in energy

being drawn from the DSO grid. The process can take several hours and cannot be
aborted.

38

Содержание Symo Hybrid 3.0

Страница 1: ...al chlorine free paper ECF sourced from certified sustainable forests FSC Perfect Charging Perfect Welding Solar Energy Fronius Energy Package EN Installation instructions Grid connected inverter 42 0...

Страница 2: ......

Страница 3: ...r 19 Safety 19 General comments regarding solar modules 20 DC terminals 20 Connecting aluminium cables 20 Do not ground the poles of the solar modules 21 Solar module strings checking the polarity and...

Страница 4: ...incorrectly performed work This may result in serious injury and damage to property Commissioning of the hybrid system may only be carried out by trained personnel in accordance with the technical re...

Страница 5: ...Observe the manufacturer s connection installation and operating instructions at all times To reduce the hazard potential to a minimum perform all installation and connec tion work carefully accordin...

Страница 6: ...is suitable for outdoor installation Because of its IP 65 protection class the inverter is resistant to water jets from any direction and can also be used in damp environments In order to minimise th...

Страница 7: ...ation of grain green fodder or animal feeds Install only on a solid surface Max ambient temperatures 13 F 140 F 25 C 60 C Relative humidity 0 100 The airflow within the inverter is from the right to t...

Страница 8: ...sloping surface Do not install the inverter on a sloping surface with its connection sockets at the top Do not install the inverter at an angle on a vertical wall or column Do not install the inverte...

Страница 9: ...Do not install the inverter overhanging with the connection sockets at the bottom Do not install the inverter on the ceiling 9 EN...

Страница 10: ...ng bracket and permanently attached using screws the cover for the data communication area is permanently attached to the inverter with screws Degree of protection IP 20 applies to the mounting bracke...

Страница 11: ...1 2 3 4 Do not warp or deform the mounting bracket Note When fitting the mounting bracket to the wall ensure that the mounting bracket does not become warped or deformed 11 EN...

Страница 12: ...ket does not become warped or deformed Installing the mounting bracket on a mast or beam When installing the inverter on a mast or support Fronius recommends the Pole Clamp kit from Rittal GmbH order...

Страница 13: ...Fitting the mount ing bracket to metal supports The mounting bracket must be affixed at a minimum of four points 1 13 EN...

Страница 14: ...oltage from solar modules or battery The DC main switch is only to be used to de energise the power stage set The con nection area is still live when the DC main switch is switched off Ensure that the...

Страница 15: ...cting single wire round aluminium cables Because of the formation of a non conductive oxide layer due to the reaction of alu minium with air the following points must be considered when connecting alu...

Страница 16: ...0780 strain relief device M32 x 1 5 KB 18 25 Requirements for the neutral con ductor Note Ensure that the grid neutral conductor is grounded This may not be the case for IT grids insulated grids with...

Страница 17: ...rain relief device should fail This can be ensured for example by making it somewhat longer and by laying it in a loop If AC cables are laid over the shaft of the DC main switch or across the connecti...

Страница 18: ...ulations the electricity retailer or other factors may require an earth leak age circuit breaker in the AC connection lead For this situation a type A earth leakage circuit breaker with a tripping cur...

Страница 19: ...rea is still live when the DC main switch is switched off Ensure that the power stage set and connection area are disconnected from one another before carrying out any maintenance or service tasks The...

Страница 20: ...s com Note Before connecting up the solar modules check that the voltage for the solar mod ules specified by the manufacturer corresponds to the actual measured voltage DC terminals Max cross section...

Страница 21: ...to be re connected Do not ground the poles of the solar modules The hybrid inverter is a transformerless device The individual poles of the solar modules must not be grounded Solar module strings chec...

Страница 22: ...1 2 3 4 5 6 22...

Страница 23: ...or across the connection block of the DC main switch they may be damaged when the inverter is swung in or they may even prevent the inverter from being swung in IMPORTANT Do not lay DC cables over th...

Страница 24: ...If overlength AC or DC cables are to be laid in loops in the connection area attach the cables with cable ties to the eyelets provided on the top and bottom of the con nection block 24...

Страница 25: ...Connecting the battery to the inverter Connecting the battery DC cables to the inverter Only break out as many target break points as there are cables 1 2 3 4 5 6 25 EN...

Страница 26: ...7 8 9 10 11 12 26...

Страница 27: ...vailable from Fronius as an option IMPORTANT If data communication cables are wired into the inverter observe the fol lowing points Depending on the number and cross section of the data communication...

Страница 28: ...3 4 5 6 7 Terminating res istor for Modbus cable The terminating resistor must be set according to how the individual devices are con figured see diagram below 28...

Страница 29: ...ronius Smart Meter A DC connection and ground connection must also be established between the battery and the inverter The connection of the individual lines was illustrated in the preceding chapters...

Страница 30: ...t prevents the inverter from being swung into the mounting bracket unless the DC main switch is switched off Never attach the inverter to the mounting bracket or swing it in unless the DC main switch...

Страница 31: ...3 4 31 EN...

Страница 32: ...ioning the equipment When starting the inverter for the first time it is necessary to select various setup set tings If setup is interrupted before it is complete it can be restarted by means of an AC...

Страница 33: ...P Deutschland 4 6 kVA cosPhi P 0 95 DE2F Deutschland 4 6 kVA konst cosPhi 1 DE2P Deutschland 4 6 kVA cosPhi P 0 9 DE2U Deutschland 4 6 kVA Q U DKA1 West Denmark 125kW DKA2 East Denmark 125kW EE Estoni...

Страница 34: ...m monitoring web page Settings IO mapping Emergency power Set the system to Auto in the emergency power system overview Fronius system monitoring web page Settings System overview Emergency power oper...

Страница 35: ...hmpilot is used it should be installed outside of the emergency power cir cuit IMPORTANT For control related reasons the Ohmpilot cannot be operated in emer gency power situations In the event of a po...

Страница 36: ...us system monitoring function for the first time is made considerably easier with the Fronius Solar web app The Fronius Solar web app is available in the respective app stores Or visit https wizard so...

Страница 37: ...owing in the browser http datamanager or 192 168 250 181 IP address for WLAN connection or 169 254 0 180 IP address for LAN connection The Setup wizard start page is displayed If you run the technicia...

Страница 38: ...tic process is triggered to calibrate all the components This involves charging the Fronius Solar Bat tery fully After that the system automatically starts in the set operating mode This calibration c...

Страница 39: ...ition once a year check that all screw joints are tight Maintenance and servicing may only be carried out by Fronius trained service techni cians Cleaning Clean the inverter as required with a damp cl...

Страница 40: ...INTERNATIONAL GMBH Froniusstra e 1 A 4643 Pettenbach AUSTRIA contact fronius com www fronius com Under www fronius com contact you will find the addresses of all Fronius Sales Service Partners and lo...

Отзывы: