12
11
10
AC~
(Steps: 6-11)
7
9
8
18
17
16
DC=
(Steps: 12-17)
13
15
14
1
2
open access point
Setup your PV system in a few minutes.
START INSTALLATION
LOGIN
Log in with your Fronius credentials (email adress
& password) in order to get the most out of the
PV System. Installing a new product does not
require a Login.
Imprint & Contact
Terms & Conditions
Data Privacy
Fronius Solar.start
23
Ok
Standby
Uncritical Error
(flashing)
Critical Error
Network Error
Connecting
(flashing)
Connected
1x
WLAN access point
2x
WPS
3-6 sec.
Quit Service Message
22
CLOSE & COMMISSION
(Steps: 18-23)
19
20
5
4
≥ 200 mm
(≥ 7.87 inch)
≥ 200 mm
(≥ 7.87 inch)
≥ 445 mm
(≥ 17.52 inch)
≥ 250 mm
(≥ 9.84 inch)
≥ 225 mm
(≥ 8.86 inch)
≥ 275 mm
(≥ 10.83 inch)
≥ 150 mm
(≥ 5.91 inch)
≥ 100 mm
(≥ 3.94 inch)
-25°C - +60°C
0 - 100%
MOUNTING
(Steps: 1-6)
1
3
2
min. 10°
IP 66
DUST
DUST
NH
3
U
DCmax
=1000V
U
DCmax
=920V
U
DCmax
=835V
3500m
3001m
4000m
> 4001m
3501m
3000m
0m
IP WLAN:
192.168.250.181 |
Password:
12345678
IP LAN1:
169.254.0.180
PV point
clamp
6
21
≥ 200 mm
(≥ 7.87 inch)
≥ 200 mm
(≥ 7.87 inch)
≥ 440 mm
(≥ 17.32 inch)
≥ 250 mm
(≥ 9.84 inch)
≥ 225 mm
(≥ 8.86 inch)
≥ 270 mm
(≥ 10.63 inch)
≥ 150 mm
(≥ 5.91 inch)
≥ 100 mm
(≥ 3.94 inch)
-25°C - +60°C
0 - 100%
Symo GEN24 3-5 kW
Symo GEN24 6-10 kW
3-5 kW Plus
3-5 kW Plus
6-10 kW Plus
6-10 kW Plus