Fronius Smart Meter 50kA-3 Скачать руководство пользователя страница 22

kCT x kVT

Maximum display

 

Resolution

1 to 9.9

9 9 9 9 9 9 . 9 9

kWh / kvarh

10 Wh / varh

10 to 99.9

9 9 9 9 9 9 9 . 9

kWh / kvarh

100 Wh / varh

100 to 999.9

9 9 9 9 9 9 9 9

kWh / kvarh

1 kWh / varh

1000 to 9999.9

9 9 9 9 9 9 . 9 9

MWh / kvarh

10 kWh / varh

≥ 10000

9 9 9 9 9 9 9 . 9

MWh / kvarh

100 kWh / varh

Average power

Measured variable

Effective power

Calculation

Average value over set period of time

Integration time

5 / 8 / 10 / 15 / 20 / 30 / 60 minutes

Operating hours counter

Operating hours counter

Hours and minutes

Resolution

7-digit (5 hours + 2 minutes)

Max. display

99,999 h 59 min

Counting start

3-phase effective power

Programmable values

0.10 to 50% Pn

3-phase effective power

In acc. with 400 V 5 A - 3464 W

Operating hours counter reset

Accessible via keypad or locked

Output

Energy pulse

Pulse output compatible with S0 EN/IEC 62053-31
Optical relay with NO contact SPST-NO, floating

Contact load

110 V DC/AC - 50 mA

Assignable energy

Active or reactive energy

Pulse value

10 Wh (Varh) - 100 Wh (Varh) - 1 kWh
(kVarh) - 10 kWh (kVarh) - 100 kWh
(kVarh) - 1000 kWh (kVarh)

Pulse duration

50 - 100 - 150 - 200 - 300 - 400 - 500 ms

RS485 communication

Electrically isolated from input and auxiliary voltage

Standard

RS485 - 3 conductors

Transmission

Serial, asynchronous

Protocol

Modbus RTU

Addresses

1 to 255

Number of bits

8

Stop bit

1

Parity bit

None - even - odd

Baud rate

4800 - 9600 - 19200 bit/s

Response time

≤ 200 ms

22

Содержание Smart Meter 50kA-3

Страница 1: ...rced from certified sustainable forests FSC Perfect Charging Perfect Welding Solar Energy Fronius Smart Meter 50kA 3 EN Operating instructions PV system monitoring 42 0426 0280 EN 006 19082020 www you...

Страница 2: ......

Страница 3: ...r current transformer 11 Connecting the current transformers 12 Suitable voltage transformers 12 Connecting the data communication cable to the inverter 12 Terminating resistors 13 Setting the transfo...

Страница 4: ...there is a danger of Injury or death to the operator or a third party Damage to the device and other material assets belonging to the operating company Any safety devices that are not fully functional...

Страница 5: ...hanged immediately Copyright Copyright of these operating instructions remains with the manufacturer The text and illustrations are all technically correct at the time of printing We reserve the right...

Страница 6: ...w of your own electricity consumption The meter measures the power flow to the loads or the grid and forwards the information to the Fronius Datamanager via ModBus RTU RS485 interface CAUTION Observe...

Страница 7: ...led in an environmentally responsible manner Ensure that you return your used device to your dealer or obtain information regarding a local authorised collection and disposal system Failure to comply...

Страница 8: ...resistors on page 13 11 Tug on each wire and plug to make sure that they are securely connected to the ter minal blocks 12 Switch on the power supply to the Fronius Smart Meter 13 Check the firmware...

Страница 9: ...s marked L1 L2 and L3 In rare cases the neutral conductor has an overcurrent protection which must simul taneously interrupt neutral and unearthed lines Cabling Always switch off the power supply befo...

Страница 10: ...10...

Страница 11: ...the current transformer must be greater than the sum of the power of the Fronius Smart Meter and the leads The higher the power the better Line resistances at different cross sections copper wires Se...

Страница 12: ...Smart Meter Always switch off the power supply before disconnecting live conductors The current transformers are connected to connections 1 and 3 4 and 6 7 and 9 If necessary excessively long cables c...

Страница 13: ...o the mains cabling use wires or cables that are designed for 300 to 600 V never less than the operating voltage Use double insulated or sheathed output cables when they are close to bare con ductors...

Страница 14: ...he trans formation ratio of the current and voltage trans formers on the Smart Meter Only the transformation ratio of the current and voltage transformers must be set All other parameters have already...

Страница 15: ...r kilowatt hours of energy sourced from the grid and energy fed into the grid Based on the relevant billing data the electricity retailer will invoice the energy sourced from the grid and the purchase...

Страница 16: ...being installed a separate address see Setting the address of the Fronius Smart Meter page 17 must be set for each one The primary meter always has address 1 all other meters are numbered in the addre...

Страница 17: ...The remaining Modbus nodes must be distributed equally Setting the address of the Fronius Smart Meter Symbol Name Event Function Prog 1 x Increases the set value Page 1 x Moves the cursor Enter 1 x co...

Страница 18: ...Connect to the Fronius Datamanager via access point 1 Activate the access point on the Datamanager 2 Connect to the Fronius_240 XXXXXX network 3 Go to the Fronius Datamanager website Open IP address h...

Страница 19: ...OK when the status OK is displayed If the Timeout status is displayed repeat the procedure 9 Click on the checkmark in the upper right corner to save the settings 10 The Fronius Smart Meter is fully...

Страница 20: ...Operation Menu structure A graphic view of the menu structure can be found in the User Information that is sup plied as standard 20...

Страница 21: ...x 6 A Starting current 20 mA Current transformer ratio kCT 1 9 999 e g TC 800 5A kCT 160 For direct connection kCT 1 Short time overload EN IEC 62053 21 EN IEC 62053 23 20 lmax 0 5 s Self consumption...

Страница 22: ...e effective power Programmable values 0 10 to 50 Pn 3 phase effective power In acc with 400 V 5 A 3464 W Operating hours counter reset Accessible via keypad or locked Output Energy pulse Pulse output...

Страница 23: ...23 C 2 C Operating range 5 to 55 C Temperature limit for storage and trans port 25 to 70 C Tropical model Max power loss for thermal dimensioning of the switch cabinet 2 8 W Housing Housing 4 modules...

Страница 24: ...tailed country specific warranty terms are available on the internet www fronius com solar warranty To obtain the full warranty period for your newly installed Fronius inverter or storage sys tem plea...

Страница 25: ...25 EN...

Страница 26: ...26...

Страница 27: ...27 EN...

Страница 28: ...INTERNATIONAL GMBH Froniusstra e 1 A 4643 Pettenbach AUSTRIA contact fronius com www fronius com Under www fronius com contact you will find the addresses of all Fronius Sales Service Partners and lo...

Отзывы: