Froling Turbomatic TMC 100 Скачать руководство пользователя страница 21

Installation 

Assembly work 

 

 

 

Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen 

Page 21 

Tel +43 (0) 7248 606-0  Fax +43 (0) 7248 606-600   [email protected]  www.froeling.com

  

M1020008_en 

     

     

 

 

U

 

Insert the bottom insulation cover plate between the side panels 

U

 

Screw the bottom insulation cover plate to the side insulation cover 

plates on the left and right as shown 

 

 

 

      

     

 

 

U

 

Measure the diagonal length to align 

the side panels in parallel position 

U

 

Fix the position of the aligned side 

panels by screwing them in at the 

upper insulation mounting brackets 

U

 

Attach the insulating back panel and 

secure with self-tapping screws 

 
 
 

 

 

     

     

 

 

U

 

Put on the top heat insulation mat and pull it back under the 

connection profile to the WOS cover 

 

A hole for the transport lug is pre-cut in the mat 

U

 

Put in smaller pieces at the side and behind the WOS cover 

Содержание Turbomatic TMC 100

Страница 1: ...e 12 A 4710 Grieskirchen Tel 43 0 7248 606 0 Fax 43 0 7248 606 600 info froeling com www froeling com Installation Instructions Turbomatic TMC 70 100 Be sure to read and comply with the operating inst...

Страница 2: ......

Страница 3: ...us know Subject to technical change Delivery Certificate Keeping a record that the delivery was received correctly and collecting customer specific data relating to the system allows us to respond qu...

Страница 4: ...p in the boiler room 14 3 2 1 Removing the boiler from the pallet 14 3 2 2 Moving the boiler in the boiler room 14 3 2 3 Minimum distances in the boiler room 15 3 2 4 General information for boiler ro...

Страница 5: ...3 14 Fitting the noise protection hood and ashcans 32 3 3 15 Fitting switch cabinet and cable ducts 33 3 3 16 Final tests 34 3 4 Electrical connection 35 3 4 1 Laying the cable 35 3 4 2 Install the b...

Страница 6: ...eating systems NORM B 8130 Safety devices open water heating systems NORM B 8131 Closed water heating systems safety requirements DIN 4751 Parts 1 4 Heating system safety equipment NORM DIN EN 13384 1...

Страница 7: ...the building authorities Austria Inform the civic municipal building authorities Germany Register with an approved chimney sweep the building authorities 1 2 2 Requirements for central heating water...

Страница 8: ...ith a storage tank as this allows you to achieve continuous reduction within the ideal performance range of the boiler For the correct dimensions of the storage tank and the line insulation in accorda...

Страница 9: ...mney system should be as short as possible The incline of the connection should not exceed 30 45 Insulate the connection The entire flue gas system chimney and connection must be calculated as per NOR...

Страница 10: ...ight return connection 450 H5 Height drain 125 H8 Height induced draught fan connection 1540 H15 Height gravity shaft connection 730 H18 Height safety battery connection mm 1200 B Width of boiler 820...

Страница 11: ...C 70 85 100 A Flue gas pipe diameter mm 200 B Boiler outfeed connection 2 C Connecting the thermal discharge safety device 1 2 D Boiler return feed connection 2 E Connection for filling emptying cock...

Страница 12: ...W 77 1 93 3 108 1 Detailed information on the fuel is included in the operating instructions in the section on Permitted fuels Test data for operation with wood chips Description Unit 70 85 100 Testin...

Страница 13: ...of issue 1 1 1 Carbon monoxide CO Rated load Partial load mg MJ 25 09 68 09 17 18 45 18 9 27 22 27 Nitrogen oxide NOx Rated load Partial load mg MJ 74 09 not measured 66 18 not measured 58 27 not mea...

Страница 14: ...packaging U Remove boiler from pallet See 3 2 1 Removing the boiler from the pallet 3 1 2 Temporary storage If the system is to be installed at a later date U Store the boiler insulation and control u...

Страница 15: ...sures Dimension Description Units 70 100 A Minimum distance from back of boiler to wall 700 B Minimum distance from front of boiler to wall space required for opening insulating door 950 C Minimum dis...

Страница 16: ...oles on the chamber opposite the operating side should be closed with M5 hexagonal screws or heat resistant adhesive tape U Remove the chamber from the pallet and position in the boiler The connection...

Страница 17: ...48 606 600 info froeling com www froeling com M1020008_en 3 Installing fitted screws U Screw 12 fitted screws to the threaded holes in the chamber provided 3 3 2 Installing the boiler insulation Insta...

Страница 18: ...ng the insulating side panels NOTICE The separate parts of the boiler insulation are fitted with a protective film This must always be removed before installation For both rear insulating side panels...

Страница 19: ...insulation mat U Put the side panel on at the back on the right by the insulation mounting brackets at the bottom U Push the side panel onto the boiler and screw to the connecting profile with a self...

Страница 20: ...e right side panel U Put a spacer washer 44 mm onto the threaded bolts on the boiler U Push the front side panel onto the boiler and put the insulation mounting bracket onto the threaded bolts U Put o...

Страница 21: ...side insulation cover plates on the left and right as shown U Measure the diagonal length to align the side panels in parallel position U Fix the position of the aligned side panels by screwing them i...

Страница 22: ...ls and push back Ensure that the insulating cover pin engages in the slit of the side panels U Screw the insulating cover to the side insulation cover plates on the left and right U Put on the rear in...

Страница 23: ...at the fitted screws engage correctly in the spring shackles U Fit the cover plate at the stoker duct with self tapping screws U Put on the insulation on the grate shaft side Ensure that the fitted sc...

Страница 24: ...til about 20 mm of the sensor protrudes from the brass bushing The point of the sensor should be in the middle of the flue gas pipe U Fix the position of the flue gas sensor lightly with a wing nut U...

Страница 25: ...lever lies on the buffer stop U Turn the WOS mounting bracket so that the linking plates of the WOS springs do not lie on the heat exchanger pipes U Secure the position using a clamping jaw U Fit the...

Страница 26: ...th of 1000 mm for the heat exchanger ash removal unit U Take out the key and remove the shaft circlip U Lubricate the stub shaft of the ash screw U Insert the ash screw at the flange plate and turn un...

Страница 27: ...the chamber ash removal unit U Take out the key and remove the shaft circlip U Lubricate the stub shaft of the ash screw U Insert the ash screw at the geared motor U Turn the ash screw until the keywa...

Страница 28: ...ition the stoker unit by the chamber and put the ceramic fibre seal over the stoker screw U Secure the stoker unit to the chamber flange 4 hexagonal screws M x mm 4 spacer washers 4 hexagonal nuts M U...

Страница 29: ...o the connection at the chamber left next to the stoker connection and fix with a hose clip 3 3 10 Installing the combustion chamber overpressure sensor If combined with a pellet suction system the co...

Страница 30: ...uct U Secure the transparent tubing to the hose nozzle with a hose clamp U Install the underpressure sensor cartridge as shown with self tapping screws U Connect transparent tubing with hose clip at M...

Страница 31: ...handle in the hole provided U Fasten the door handle in place 1 hexagonal screw M8x30 U After assembly check that the door handle operates smoothly U Position the safety clamp on the door frame U Fix...

Страница 32: ...ection hood and ashcans U Put the noise protection hood over the cable duct and fix with a self tapping screw Ensure that the fitted screws engage correctly in the spring shackles Use a self tapping s...

Страница 33: ...length of the cables for the individual units are measured for this side U Put 12 mm spacer washers on the threaded bolts U Put the bracket for the switch cabinet on the threaded bolts and fix 4 spac...

Страница 34: ...various distances apart Use self tapping screws with broad heads The vertical cable duct below the switch cabinet must be cut out horizontally connection to horizontal duct U Fit the switch cabinet to...

Страница 35: ...le ties strain relief U Gather the cables for the boiler sensor door contact switch STL ID fan Lambda probe and WOS drive at the back of the boiler and secure to the insulation with cable ties and cem...

Страница 36: ...ot be shut off 1 Thermal discharge safety device sensor 2 Thermal discharge safety device opens at 95 C 3 Safety valve 4 Cleaning valve T piece 5 Check valve 6 Dirt trap 7 Pressure reducing valve Requ...

Страница 37: ...r for the first time U Adjust the control unit to the system type The keypad assignment and the steps necessary to modify the control parameters are detailed in the accompanying operating instructions...

Страница 38: ...ormed U Commissioning report given to customer U Telephone number for manufacturer s service department indicated U Rating plate attached Following items checked U No defects found U Notice All nation...

Страница 39: ...pendix Your notes Fr ling Heizkessel und Beh lterbau Ges m b H Industriestrasse 12 A 4710 Grieskirchen Page 39 Tel 43 0 7248 606 0 Fax 43 0 7248 606 600 info froeling com www froeling com M1020008_en...