![Fröling TI 350 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/froling-0/ti-350/ti-350_operating-instructions-manual_2338785076.webp)
immediately
❒ Specify the type of measurement (
nominal load
/
partial load
)
➥ The flue gas temperature and residual oxygen content should have
stabilised approximately 20 minutes after activation
➥ The display will indicate that the boiler is ready for measurement as
soon as all the conditions for the measurement are fulfilled
5.7 Replacement parts
With Froling original replacement parts in your boiler, you are using parts that match
perfectly. As the parts fit together so well, installation times are shortened and a long
service life is maintained.
NOTICE
Installing non-original parts will invalidate the guarantee.
❒ Only replace components or parts with original replacement parts
5.8 Disposal information
5.8.1 Disposal of the ash
❒ The ash should be disposed of in accordance with waste management
regulations.
5.8.2 Disposal of system components
❒ Ensure that the system is disposed of in an environmentally friendly way in
accordance with waste management regulations.
❒ You can separate and clean recyclable materials and send them to a recycling
centre.
❒ The combustion chamber must be disposed of as builders' waste.
5
Servicing the system
Replacement parts
76
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com