Assembly | 6
M1980822_en | Installation instructions Wood chip boiler T4e 20-180
59
6.6.1 Insulate the connection line
When using the optionally available thermal insulation supplied by Fröling GesmbH,
perform the following steps:
r
Cut the half shells of thermal insulation to length and lay them on the connection line
r
Create an opening for access to the measuring port
r
Apply protective foil at the projecting lugs
r
Glue the half shells to each other
6.6.2 Install the brackets for accessories
r
Using appropriate fasteners, attach the brackets to the wall on the boiler
r
Attach the accessories to the brackets