Transport and storage | 5
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact
25
5.3 Positioning
NOTICE
Damage to components if handled incorrectly
r
Follow the transport instructions on the packaging
r
Transport components with care to avoid damage
r
Protect the packaging against damp conditions
r
Pay attention to the pallet's centre of gravity when lifting
r
Position a fork-lift or similar lifting device at the pallet and bring in the components
If the firewood boiler cannot be brought in on the pallet:
r
remove the cardboard and take the boiler off the pallet
"Removing boiler from pallet" [
}
25]
If the pellet unit cannot be brought in on the pallet:
r
Remove the cardboard and take the pellet unit off the pallet
"Removing the pellet unit from the pallet" [
}
27]
Positioning using a crane
r
Attach the crane hook to the attachment point correctly and position the boiler
5.4 Positioning at the installation site
5.4.1 Removing boiler from pallet
r
Lift the cardboard boxes for the insulation, controller and control off the pallet