Installation
ACT VS 800 - 2500
19 – EN
7.7 Electrical
connections
Danger
!
Supply voltage!
The connection to the electric mains should only be carried out by qualified skilled personnel and must
correspond to the legal provisions in force in your region.
Before connecting the unit to the electrical supply, verify the data nameplate for the proper electrical information. Voltage
tolerance is +/- 10%. The installer is responsible for supplying and installing the power cable. Be sure to provide the
proper fuses or breakers based on the data information located on the nameplate.
ACT VS 800 – 1250
ACT VS 1500 – 2500
A residual-current device (RCD) with I
n =0.3A Class B
is suggested. The cross section of the power supply
cables must comply with the consumption of the dryer,
while keeping into account also the ambient temperature,
the conditions of the mains installation, the length of the
cables, and the requirements enforced by the local Power
Provider.
Compressor and fan(s) proper rotation direction are
managed automatically by the inverters.
It is not necessary to observe the phases sequence when
connecting the power cable to the main switch.
Danger!
Supply voltage and missing earth connection!
Important: ensure that the plant is connected to earth.
Do not use plug adapters at the power plug.
Possible replacement of the power plug must only be carried out by a qualified electrician.
Note!
This dryer is not suitable for employment on IT-systems.
This dryer is not suitable for employment on grounded-delta systems