
11
6
Installation
6.1
Safety Instructions
– Danger of injury from falling parts.
Wear safety shoes.
Check load capacity and attachment of hoists.
– Danger of injury from unstable assembly.
Tighten screws to the specified tightening torque. See
Chapter 10.1.1, "Tightening Torques for Screws and Nuts"
page 27
.
Use a torque wrench or an impact driver with adjustable
torque.
– Material damage from swinging during adjustment of spher-
ical cap feet.
Use spherical cap base plates.
– Material damage from overload.
Install a current limiter to protect the motor.
6.2
Installation Location
For standard pumps, the installation location must meet the fol-
lowing requirements:
– Nonexplosive atmosphere
– Dust-free environment
– Ambient temperature: –20°C to +40°C
– Moisture and salt contents in ambient air:
The values are given in the "Motor Operator's Manual." It can
be found in the attached documents.
– Foundation sized adequately for the pump weight
– Horizontal and level installation surface, adequate installa-
tion surface strength for pump mass
– Adequate clearance for maintenance work
– Adequate air supply for motor cooling
6.3
Reduction of Noise and Vibration
6.3.1
Primary Measures
Operate the pump in the optimum working range.
– Do not operate with very high flow rates. Optionally in-
stall a flow controller in the discharge line.
– Operate the pump without cavitation. See
"Installation of Pipes" page 11
.
Decouple the suction and discharge lines from vibrations.
– Support lines.
– Align lines.
– Install vibration isolators.
6.3.2
Secondary Measures
Take structural measures such as the following:
– Acoustic paneling
– Enclosure in housing
6.4
Pump Fixation
Models FSPE and FSP...V
Versions A and C:
Set up the pump on the spherical cap bearings and align.
Versions B and D:
Screw the pump on the motor foot to the foundation.
Model KF
Versions A and C:
Set up the pump on the spherical cap bearings and align.
Versions B and D:
Screw the pump on the compact bearing support with base
to the foundation.
Model L
Versions A and C:
Set up the pump on the spherical cap bearings and align.
Versions B and D:
Screw the pump on the base frame to the foundation.
Carriage (Optional)
1. Set up the pump at the installation location. Lock the locks
on the rollers (if present) or secure the carriage with chocks.
2. Ground the carriage to dissipate electrostatic charge.
3. Position hose line to ensure that it cannot be damaged.
6.4.1
Installation of Pipes
Lay and connect pipes as follows:
Keep the pipe resistance as low as possible: Avoid unneces-
sary installation of valves, elbows, and abrupt pipe transi-
tions.
Fig. 14
Pipe transitions
Содержание FSP Series
Страница 31: ...31 950 Spring Part Num ber Name ...