610.020-IOM (NOV 19)
Page 13
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
AGHN/GHN/GGHN/MHF (071 Ø and >)
Step 1
Units shipped with heavy duty plastic wrap on the skid.
Step 2
Remove plastic wrap and support members from the unit.
Step 3
Leave the unit on the skid and place forks under the full
span of the skid.
Step 4
Secure hangers to the ceiling support rods. Remove all
shipping legs and the skid from the unit.