The starter rope needs be fitted to the
shackle in the upper cage
The 2 part propeller needs to be joined
prior to fitting. Prior to mounting to the
motor ensure the parts are fitted such that
the motors rotation will produce thrust in
the correct direction.
The Propeller is assembled with 6 screws
and propeller plate at the gearbox.
(M6 x 35;10mm 10Nm)