15
4.
INSTALLATION
4.1.
Requirements for installation the serve-over
Installation of the unit must be performed following next requirements:
•
The unit must be aligned horizontally (both depth and length) and installed in
the stable position.
•
Set up the unit only on the designated adjustable legs.
•
It is forbidden to install the unit close to any heating equipment or any HVAC
elements (air outlet etc.).
•
Keep a sufficient distance around the unit. It must be possible to open the doors
without any obstructions.
Fig. 8.
Example of unsuitable ambient conditions
Содержание VEGA QB HG
Страница 1: ...OPERATION MANUAL SERVE OVER VEGA QB LG HG...
Страница 6: ...6 1 2 Dimensions Fig 2 Dimensions of Vega QB HG TD Fig 3 Dimensions of Vega QB LG TD...
Страница 7: ...7 Fig 4 Dimensions of Vega QB HG LU Fig 5 Dimensions of Vega QB LG LU...
Страница 14: ...14 Install the plastic legs Lower the serve over...
Страница 17: ...17 Apply silicone to seal the perimeter of connection Push the serve overs together...
Страница 18: ...18 With help of a level check if both serve overs are horizontal All 4 connection slot positions in the figure...
Страница 21: ...21 Example of installed serve overs...
Страница 35: ...35 Date Work Name...