![FREEWIRE Boost Charger Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/freewire/boost-charger/boost-charger_installation-manual_2331259027.webp)
27
2
INSTALLATION OF THE BOOST CHARGER
Step 1
Boost Charger works with a normally closed external safety shutoff switch. In order to wire up the
external safety shutoff switch, the red jumper shown below must first be removed.
Step 2
Wire up the remote shut off using 20 AWG wire as shown below.
Step 3
Be sure to test the operation of the external safety switch per local codes and regulations before
putting into use.