background image

FreeNAS Certified Storage Server

 

Basic Setup & Deployment

Please confirm that your shipment came with all the following 
parts*

Description

Image

 

Qty

FreeNAS Certified Server**

1

Populated 3.5” Drive Trays†

Up 

 

to 26

Power Cable

2

Rail Kit with Mounting Hardware

1

This Guide

1

*Network cables vary by configuration and are not listed here.  Contact 

your iXsystems Sales Representative if you have any questions.

 

**Size of model will vary based on what you purchased.

 

†Depending on the number of drives purchased.

Note:

 If your FreeNAS Certified Storage Server arrived in 

less than pristine condition, immediately take pictures and 
contact iXsystems Support.  To contact iXsystems Support, 
email 

[email protected]

 and have your server serial 

number on hand.

1U FreeNAS Certified Storage Server Models

Installing the Outer Rails to the Rack.

1.  Attach the short bracket to the outside of the long bracket.  Align 

the pins of the rail with the slides.  The ends of each bracket must 

angle in the same direction.

2.  Adjust both the short and long brackets to the proper distance so 

that the rail fits snugly into the rack.

3.  Secure the long bracket to the front side of the outer rail with two 

M5 screws and the short bracket to the rear side of the outer rail with 

three M5 screws.

4.  Repeat steps 1-3 for the remaining outer rail.

  

Figure 1

.  Assembling the Outer Rails

Installing the System into a Rack.

1.  Confirm that chassis includes the inner rails and rail extensions.  

Also, confirm that the outer rails are installed on the rack.

2.  Align the chassis rails with the front of the rack rails.

3.  Slide the chassis rails into the rack rails, keeping the pressure even 

on both sides (It may be necessary to depress the locking tabs when 

inserting).  When the server has been pushed completely into the 

rack, the locking tabs will “click” into the locked position.

4.  (Optional) Insert and tighten the thumbscrews that hold the front 

of the server to the rack.

Figure 2.

  Installing into a Rack

Congratulations on your purchase of a FreeNAS Certified Storage Server! 

 

Here are the steps to get it ready to use:

Secure to the

 

Front of the Rack

Connect the Rear Track

 

of the Outer Rails

Connect the Front Track

 

of the Outer Rails

Secure to the

 

Rear of the Rack

Отзывы: