7
4.
Make sure that all parts of the vibration platform are properly tightened.
2. Set the Platform (3) on the Base (16).
Tip: Have a second person hold the
Handlebar (10) and tip the Base (16) to the
left and to the right while you perform the
following actions:
Insert the four Flanged Bolts (6) on the under-
side of the Platform (3) through the holes in the
Base (16).
Then, tighten a Suction Foot (17) onto each
Flanged Bolt (6).
3.
Note: For clarity, the Platform (3) is not
shown in this drawing.
Tip: It may be helpful to tip the vibration
platform onto its side for this step.
Tighten a Suction Foot (17) onto the M10 x
35mm Hex Bolt (38) in the underside of the
Base (16).
3
16
2
10
17
17
6
6
16
3
17
38