16
21. Remove the two indicated M10 x 35mm Socket
Screws (71) and M10 Washers (31) from the
Main Frame (68).
Attach the two Joint Bearings (80) on the ends
of the Short Cable (42) to the Main Frame (68)
with the two M10 x 35mm Socket Screws (71)
and M10 Washers (31) that you just removed.
Then, lay the Short Cable (42) over the Large
Pulleys (24) on the Right and Left Arms (47, 65).
22. Remove the M10 Locknut (32), the two M10
Washers (31), the M10 x 50mm Socket Bolt
(29), and the Large Pulley (24) from the Large
Pulley Bracket (41).
Route the Short Cable (42) under the Large
Pulley (24).
Reattach the Large Pulley (24) to the Large
Pulley Bracket (41) with the M10 x 50mm
Socket Bolt (29), the two M10 Washers (31),
and the M10 Locknut (32).
31
42
31
41
24
31
29
23
23. Attach a Thigh Pad (56) to one of the Large
Pad Plates (57) on the Thigh Pad Frame (45)
with two M8 x 25mm Screws (77).
Attach the other Thigh Pad (56) in the same
way.
56
56
45
57
77
80
71
31
80
42
71
68
24
47
65
21
22
32