Free2Move eSolutions eProWallbox Скачать руководство пользователя страница 4

EM330

1.

Place the Power

 

Meter

 

provided after the main utility meter and before the split power

2.

For the three-phase or single-phase electrical connection, refer to the dedicated

 

meter

installation

 

manual included in the Power

 

Meter package.

3.

Feed the Modbus communication cables through the wallbox box sheath (C). Suggested
cable: STP class 5E, 0.5 mm

2

 section.

4.

I

included

 connect the Current Transformers as indicated in the 

meter

 installation

manual, paying attention to drawn through the clamp the line according to the direction
indicated on the sensor. The neutral cable must not be drawn through the clamp.

5.

Use the following order for connecting the communication cables from the PowerMeter
to

 

the Wallbox. Starting from left on the wallbox RS485 output port CN12

EM111

Utility Meter

Wallbox

PowerMeter

Loads

Eletrical panel

RS485 Port

 CN12

4

During the installation always 

refer to

 the 

meter

 

installation 

manual 

included in the package.

2.

DPM 2.0 INSTALLATION

A d v a n c e d   f u n c t i o n a l i t i e s   s e t u p

Installation manual - Annex

  

CN12 Port

Wallbox

PowerMeter

GND B A

GND

B

+

A-

12 11

13

T

10

CN12 Port

Wallbox

PowerMeter

GND B A

GND

B

+ A-

8

6

7

T

5

Содержание eProWallbox

Страница 1: ...EN A d v a n c e d f u n c t i o n a l i t i e s s e t u p Installation manual Annex...

Страница 2: ...OF CONTENTS SECTION PAGE 1 INTRODUCTION 3 2 PROCEDURE 5 DPM 8 a DPM ENABLING 9 b DPM Pmax 8 DPM 2 0 4 Energy meter configuration 7 LOAD UNBALANCE 10 a Load unbalance enabling 11 b Load unbalance curr...

Страница 3: ...d via Bluetooth DPM DPM enabling DPM Pmax DPM 2 0 Electrical Installation Configuration Transformer ratio KI DPM Type selection Load Unbalance Load unbalance enabling Load unbalance current A d v a n...

Страница 4: ...ough the clamp the line according to the direction indicated on the sensor The neutral cable must not be drawn through the clamp 5 Use the following order for connecting the communication cables from...

Страница 5: ...Open nRF Connect and Set a filter e g ePro in order to see only eProWallboxes in the homepage 3 Select Scan on the top right corner to identify the eProwallbox to be connected via Bluetooth through it...

Страница 6: ...uetooth The UUID is associated to a specific functionality By clicking on the down arrow the specifics of the parameters will be displayed By clicking on the up arrow a new command can be set through...

Страница 7: ...onnect app Parameter DPM_TYPE This field allows to select the Power Meter model installed UUID f0f924f8 34ce 4f1d 9791 b1b19ff3ffe4 TYPE Uint8 select UINT8 on the app VALUE 00 FINDER 3ph 212 01 FINDER...

Страница 8: ...1 Identify the UUID of the DPM Pmax parameter 2 Click on the up arrow next to the Unknow characteristic 3 Select UINT32 4 In New value field insert the contractual power value expressed in Watt from 0...

Страница 9: ...Identify the UUID of the DPM Enabling parameter 2 Click on the up arrow next to Unknow characteristic 3 Select BYTE 4 In New value field insert 01 to ENABLE 00 to DISABLE Then click SEND 5 The new val...

Страница 10: ...ect BYTE on the app VALUE 00 FALSE disabled 01 TRUE enabled b Load unbalance current Parameter LOAD_UNBALANCE_CURRENT Thisvaluedefinesthemaxallowable phases currentunbalanceexpressed in mA UUID f9217d...

Страница 11: ...Registered office Free2move eSolutions S p A Piazzale Lodi 3 20137 Milan Italy esolutions free2move com...

Отзывы: