Use of Programmed Inputs - 
TPI and Relays

The following illustrations will help understand how the programming of each method can create 

a positive shutdown given a programmed input under the submersible turbine programming of 

either turbine pump interface or relay.

Turbine Pump Interface (TPI)

Turbine Pump Interface (TPI) is a communication protocol and parameter programming subset 

that allows the EVO™ series console to control several FE Petro™ intelligent pump control relays. 

The primary function of TPI is to monitor and manage FE Petro pump controllers. The FE Petro 

pump controllers are connected to the EVO™ series console via a three conductor shielded cable. 

This cable is daisy-chained between each controller. The wires connect to three terminals; a 

positive (+), a negative (–) and a ground (gnd). The wiring is then daisy-chained like color to like 

color to all pump controllers to the corresponding terminals (+  –  gnd).

On the EVO™ Series Console, the TPI port has 5 total spaces. The first two terminals (A and B) are 

not used for TPI applications. 

For EcoVFCs and MagVFCs that are functioning in a group scenario (Leveling, Priority, None) the 

#4 (Frequency) terminal should be connected between the two VFCs. This allows for frequency 

data to be transferred. 

Each controller is then given a specific address that the console uses to recognize that individual 

controller. The EVO™ console can be configured for a maximum of 31 controllers with any 

variation of controllers being accepted. The controllers themselves may have restrictions with 

how many can be configured due to dip switch limitations. Within the TPI relationship the 

EVO™ console always acts as a Primary controller and all subsequent controllers are considered 

secondary devices. Being the Primary Controller means that the EVO™ console is internally 

addressed as 0 and cannot be changed, therefore the controllers should be addressed starting at 

1 as a secondary device.

Содержание EVO Series

Страница 1: ...EVOTM SERIES AUTOMATICTANK GAUGES POSITIVE SHUTDOWN REFERENCE GUIDE ...

Страница 2: ... industry practices and the instructions in this manual Before you work with or install the equipment covered in this manual or any related equipment read this entire manual particularly the following precautions IMPORTANT To help prevent spillage from an underground storage tank make sure the delivery equipment is well maintained that there is a proper connection and that the fill adaptor is tigh...

Страница 3: ...ump Interface TPI and various other means of programming the EVO TM Series AutomaticTank Gauge ATG console including Rules Logic Conditions and settings within specific applications The following methods are covered Use of programmed Inputs TPI and relays EVO 550 5000 Use of Shutdown On Alarm in Pumps configuration EVO 200 400 600 6000 Use of logic conditions Use of Rules engine Application specif...

Страница 4: ...4 Intentionally Blank ...

Страница 5: ...trollers to the corresponding terminals gnd On the EVO Series Console theTPI port has 5 total spaces The first two terminals A and B are not used for TPI applications For EcoVFCs and MagVFCs that are functioning in a group scenario Leveling Priority None the 4 Frequency terminal should be connected between the two VFCs This allows for frequency data to be transferred Each controller is then given ...

Страница 6: ...leaded STP sump and dispenser sump 1 2 3 4 Sensor inputs programmed as inputs to a STP utilizingTPI will disable the submersible in the event of an alarm and reenable once alarm clears positive shutdown 3 wires sensors can be used in same manner as 2 wire sensors but will disable the submersible for any of the various alarms associated with a 3 wires sensor An Individual alarm such as product cann...

Страница 7: ... 3 4 Unleaded 4 20mA LS500lineleaktransducer requiredforElectronicLineLeakDetection ELLD Provide ability to energize turbine for testing and disable turbine in event of ELLD alarm positive shutdown 2 Wire sensor module 2 wires sensors located in unleaded STP sump and dispenser 1 2 3 4 Sensor inputs programmed as inputs to a STP utilizing relay module channels will disable the submersible in the ev...

Страница 8: ...NC7 NO6 C6 NC6 NO5 C5 NC5 NO4 C4 NC4 NO3 C3 NC3 NO2 C2 NC2 NO1 C1 NC1 Relay Module disables the hook signal to the pump upon alarm conditions 110 240 VAC Electrical Panel Line Neutral Switching Current 2A Max Switching Power 1500 VA Max NOTE A valid dispenser hook signal shown in the Dispenser Hook Signals section coming from the AC Input Module is required for these diagrams to function as shown ...

Страница 9: ...r Relays Each Pump has a section called Shutdown On Alarm by adding alarms in this section specific sensors or even specific alarms from a given sensor can be assignedtoperformpositiveshutdownoneachpump Inthisexample settingEventCode Any will cause the pump to be shutdown whenever the assigned sensor is not in its normal or OK state ...

Страница 10: ...10 Intentionally Blank ...

Страница 11: ...g of a submersible turbine For example the owner operator may want the submersible turbines to be disabled for 3 wire sensor unleaded sump product alarm or at a tank level alarm unleaded tank of Low or low low All required alarms in this scenario can be included under one condition to disable a specific turbine unleaded STP An additional condition can be created to disable all submersible turbines...

Страница 12: ...12 Conditions ...

Страница 13: ... the other method TPI or Relay for submersible motor control Condition outputs are programmed outcomes based on the status of any programmed condition inputs These outputs will have an Invert Input to dictate the desired ActionType in programming To invert an action is to program the opposite action as programmed Enable inverted is Disable ...

Страница 14: ...14 Intentionally Blank ...

Страница 15: ...ensor Alarm and the UNL Pump disables as the Action Rule 2 has an Event Sensor Alarm and then clears with Rule 4 The pump will then be enabled even though Rule 1 Sensor Alarm is still active Once an event happens the action is performed any future event will supersede the initial event and act based on the rule as programmed Rules are isolated events and actions will respond according to individua...

Страница 16: ...16 Intentionally Blank ...

Страница 17: ...r sections of the specific applications ELLD The ELLD Electronic Line Leak Detection positive shutdown for a 3 GPH gross Line leak fail is hardcoded into the software as this is an EPA requirement As you can see in the example below thatpositiveshutdownformprecisiontesting 1 2 isalsoavailablebysettingshutdownontest fail to Yes Testing Positive Shutdown The best and quickest way to verify positive ...