FRÄNKISCHE Profi-air DN 125 Скачать руководство пользователя страница 6

0

20

30

10

0

50

100

150

200

250

Volumenstrom [m

3

/h] 

Druckverlust [Pa] 

270

125

370

50

Ø

125

5.1 Device specifications

5.2 Dimensional drawing

5.3 Pressure loss diagram

 

Q

Electrical connection: 

1~230 V / 50 Hz; 1 m cable with connector plugs

 

Q

Heating performance: 

900 W

 

Q

Power consumption: 

4,1 A

 

Q

Safety components: 

 1 x  safety temperature monitor 
1 x  safety temperature limiter 
integrated into the circuit of the heater coil

 

Q

Air volume flow rate: 

70 to 220 m³/h

 

Q

Air pipe connection: 

2 x DN 125 connecting nipples

 

Q

Weight: 

2,8 kg

5  Technical data

Pressure loss [Pa]

Volume flow rate [m3/h]

Installation / operating instructions – defroster heating profi-air DN 125

6

Содержание Profi-air DN 125

Страница 1: ...Defroster heating profi air DN 125 Installation operating instructions Building Technology www fraenkische com...

Страница 2: ...Installation operating instructions defroster heating profi air DN 125 2...

Страница 3: ...al related or other technological requirements which cannot or can no longer be considered in this publication For this reason we cannot assume any liability which is based solely on the data provided...

Страница 4: ...instructions have to be complied with non compliance may result in personal injury and or damage to the profi air defroster heating 1 2 1 Safety regulations 1 2 2 Safety equipment and measures Q Inst...

Страница 5: ...coil must be connected to the profi air 180 flat control This control ensures that the defroster heating only operates if there is a risk that the cross flow heat exchanger can freeze The profi air d...

Страница 6: ...r plugs Q Heating performance 900 W Q Power consumption 4 1 A Q Safety components 1x safety temperature monitor 1x safety temperature limiter integrated into the circuit of the heater coil Q Air volum...

Страница 7: ...on flammable pipe DN 125 with a minimum length of 300 mm must be installed downstream of the defroster heating Failure to comply with the safety instructions can lead to injury or property damage e g...

Страница 8: ...case of vertical installation of the defroster heating a non flammable pipe with a minimum length of 300 mm must be connected downstream of the heater coil The pipe must be provided with non flammable...

Страница 9: ...at 7831 2830 FR NK ISCHE ROHRW ERKE Gebr Kirchne r GmbH Co KG 97486 K nigsb erg Bay ern Tel 49 9525 88 2555 Fax 49 9525 88 2153 info gb_ h frae nkische de www fra enkisch e com Air Luft flow Air Luft...

Страница 10: ...e rg Bayer n Tel 49 9525 88 2555 Fax 49 9525 88 2153 info gb_h fraenk ische de www frae nkische com Air Luft flow only if unit vertically mounted nur wenn Ger te vertikal montiert kun hvis aggregat mo...

Страница 11: ...h Pa Airf l o w A B US B Air Luft flow B Rech tsver sion B Righ t unit unit destr a P1 P3 P4 P2 P1 P2 Pa P3 P4 m 3 Pa m 3 Eins tellw erte Cali brat i o n Cali braz i o ne 0 120 100 80 60 40 20 110 90...

Страница 12: ...In addition applicable local regulations and safety provisions must be complied with 8 Maintenance and cleaning B Rech tsver sion B Righ t unit unit destr a P1 P3 P4 P2 P1 P2 Pa P3 P4 m 3 Pa m 3 Eins...

Страница 13: ...resh air for apartments and residential buildings The product complies with the regulations particularly the protection requirements of the following EU directives Low Voltage Directive 2014 35 EU EMC...

Страница 14: ...oped and produced for applications in so called comfort ventilation systems Any other application is considered improper and can lead to damage to the defroster heating or personal injury which the ma...

Страница 15: ...Notes Installation operating instructions defroster heating profi air DN 125 15...

Страница 16: ...o change without notice Cat no 5000 1340 00 01 2018 FR NKISCHE Rohrwerke Gebr Kirchner GmbH Co KG Hellinger Str 1 97486 K nigsberg Germany Phone 49 9525 88 2200 Fax 49 9525 88 92200 marketing fraenkis...

Отзывы: