background image

DRAFT 24 Jul 2013 
 

 

Page 3 of 5 

 

 

Hearth 

The hearth should be level and able to accommodate the weight of the stove and its chimney if the chimney 
is not independently supported. The weight of the stove is indicated in the brochure. 
 
The stove should preferably be installed on a non-combustible hearth of a size and construction that is in 
accordance with the provisions of the current Building Regulations Approved Document J. 
 
The clearance distances to combustible material beneath, surrounding or upon the hearth and walls adjacent 
to the hearth should comply with the guidance on the separation of combustible material given in Building 
Regulations Approved Document J and also in these stove instructions. 
 
If the stove is to be installed on a combustible floor surface, it must be covered with a non-combustible material 
at least 12mm thick, in accordance with Building Regulations Approved Document J, to a distance of 30 cm in 
front of the stove and 15 cm to each side measuring from the door of the combustion chamber. 
 
 

Combustion air supply 

In order for the stove to perform efficiently and safely there must be an adequate air supply into the room in 
which the stove is installed to provide combustion air. The provision of air supply to the stove must be in 
accordance with current Building Regulations Approved Document J. Special attention should be taken in 
newer build properties where the

 

design air permeability is less than 5m

3

/h.m

2

. Approved Document J gives 

more information on this. An opening window is not appropriate for this purpose. 
 
The fitting of an external air kit direct to outside air must not be considered substitute for installing 
the appliance with a permanently open air vent in compliance with ventilation requirements stated in 
Approved Document J. Please reference ADJ for further guidance. 
 
 

Connection to chimney 

Stoves may have a choice of either a rear or top flue gas connector that allows connection to either a 
masonry chimney or a prefabricated factory made insulated metal chimney in accordance with their 
instructions. In some cases it may be necessary to fit an adaptor to increase the diameter of the flue to the 
minimum required 150 mm section of the chimney or liner. All joints in the connection between the stove and 
the chimney must be made gastight using fire cement and where necessary fire-proof rope infill. Means 
should be made for sweeping the entire length of the flue, be that through the appliance or by suitable 
sweeping hatch in the flue.  
 

Commissioning and handover 

Ensure all parts are fitted in accordance with the instructions. 
 
On completion of the installation allow a suitable period of time for any fire cement and mortar to dry out, 
before lighting the stove. Once the stove is under fire check all seals for soundness and check that the flue is 
functioning correctly and that all products of combustion are vented safely to atmosphere via the chimney 
terminal. 
On completion of the installation and commissioning ensure that the operating instructions for the stove are 
left with the customer. Ensure to advise the customer on the correct use of the appliance and warn them to 
use only the recommended fuel for the stove. 
Advise the user what to do should smoke or fumes be emitted from the stove. The customer should be 
warned to use a fireguard to BS 8423:2002 (Replaces BS 6539) in the presence of children, aged and/or 
infirm persons. 

 

HETAS Ltd Approval; 

These appliances have been approved by HETAS Ltd as an intermittent operating appliance for burning wood 
logs only.  

Содержание Montfort MK2

Страница 1: ...appliance Installation instructions Operating instructions Spare parts Warranty certificate Document n 1295 10 20 03 2012 Technical manual to be saved by the user for future reference Parc d activit s...

Страница 2: ...Building Control approval or is installed by a Competent Person registered with a Government approved Competent Persons Scheme HETAS Ltd operate such a Scheme and a listing of their Registered Compete...

Страница 3: ...for solid fuel must be used in accordance with Building Regulations Approved Document J Any existing chimney must be clear of obstruction and have been swept clean immediately before installation of...

Страница 4: ...iance with a permanently open air vent in compliance with ventilation requirements stated in Approved Document J Please reference ADJ for further guidance Connection to chimney Stoves may have a choic...

Страница 5: ...ove have been carried out correctly and that the chimney has been swept clean is sound and free from any obstructions As part of the stoves commissioning and handover the installer should have shown y...

Страница 6: ...gade should be called immediately Do not relight the stove until the chimney and flueway have been cleaned and examined by a professional Permanent air vent The stove requires a permanent and adequate...

Страница 7: ...p 8 Cleaning p 8 Maintenance of the chimney p 8 Maintenance of the stove p 8 Recommendations p 9 Trouble shooting p 10 FRANCO BELGE congratulates you on your choice FRANCO BELGE guarantees the quality...

Страница 8: ...of the combustion chamber FUEL WOOD Reference 134 05 02 Nominal heat output kW 5 Chimney draft required Pa 12 Hearth dimensions width mm 335 depth mm 205 height mm 250 Log dimensions lenght maxi cm 2...

Страница 9: ...asons The installation must be carried out according to the standards and the Building Regulations It is the installer responsability to ensure that the manufacturer s intructions are complied with 2...

Страница 10: ...l Building Inspector The flue must be in good condition and must provide sufficient draught The flue must be suitable for the installation of solid fuel burning appliances and comply with Current Buil...

Страница 11: ...ls have been removed and are not blocking any of the air passages Check that all removable internal components are correctly installed as they May have moved in transit Note all gaskets glass fiber ro...

Страница 12: ...Montfort Mk2 Model 1340502 Technical manual 1295 7 Figure 5 Replacing the parts Figure 5a Figure 5b Figure 5c Figure 5d...

Страница 13: ...se of the fume emission has been identified and corrected If necessary seek expert advice Note It is recommended to use a fireguard in the presence of children and also in the presence of old and or i...

Страница 14: ...g Figure 6 Slide the secondary air inlet B1 to the right Open the primary air inlet C1 Lay firelighters or rolled up newspapers on the grate with a reasonable quantity if necessary of dry kindling woo...

Страница 15: ...ny water splashes or condensation marks these should be cleaned off before they have chance to dry out Ensure that the fuel retainer is installed correctly fig 8 Check that there are no obstructions b...

Страница 16: ...uously burn small wood sticks bundles carpentry offcuts plywood pallets etc Smokes when lighting up Flue duct is cold Burn paper and kindling wood to increase heat Room is in decompression negative pr...

Страница 17: ...e A B C D E F 04 22 262612 Heat shield A B C D E F 01 23 265607 Knob A B C D E F 01 24 270412 Air control flap A B C D E F 01 25 300118 EF Leg A 04 25 300118 77 Leg B 04 25 300118 RJ Leg C 04 25 30011...

Страница 18: ...1340502 Technical manual 1295 13 Figure 8 Stove exploded view 36 48 20 30 41 1 24 35 3 50 43 52 9a 42 38 51 28 31 47 12 44 45 19 37 34 3 22 33 26 39 25 15 23 46 40 11 27 10 9b 8 21 21 49 13 4 32 5 5 1...

Страница 19: ...upplementary plate A B C D E F 01 43 352168 EF Top plate A 01 43 352168 77 Top plate B 01 43 352168 RJ Top plate C 01 43 352168 RP Top plate D 01 43 352168 RH Top plate E 01 43 352168 MK Top plate F 0...

Страница 20: ...Montfort Mk2 Model 1340502 Technical manual 1295 15 Notes...

Страница 21: ...ostly vis vis the price of the appliance the decision to replace or repair the appliance will be taken by the vendor Our guarantee is for 2 two years for all appliances with the exception of closed co...

Отзывы: