background image

FPI FIREPLACE PRODUCTS INTERNATIONAL LTD.  6988 Venture St., Delta, BC  Canada, V4G 1H4

918-522

07/17/06

P36D-1  Zero  Clearance

Direct  Vent  Gas  Fireplace

Owners & Installation Manual

Tested by:

Installer

: Please complete the details on the back cover 

and leave this manual with the homeowner.

Homeowner:

 Please keep these instructions for future reference.

MODELS:    P36D-NG1 Natural Gas     P36D-LP1  Propane

WARNING:  
If the information in these instructions are not followed exactly, a fi re or 
explosion may result causing property damage, personal injury or loss 
of life.  

FOR YOUR SAFETY
Do not store or use gasoline or other fl ammable vapors and liquids in the 
vicinity of this or any other appliance.

Installation and service must be performed by a qualifi ed installer, service 
agency or the gas supplier.

FOR YOUR SAFETY
What to do if you smell gas:

 

Do not try to light any appliance

 

Do not touch any electrical switch: do not 
use any phone in your building.

 

Immediately call your gas supplier from a 
neighbour's phone. Follow the gas 

 supplier's 

instructions.

 

If you  cannot reach your gas supplier, call 
the fi re department.

Содержание Regency P36D-LP1

Страница 1: ...followed exactly a re or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY Do not store or use gasoline or other ammable vapors and liquids in the vicinity...

Страница 2: ...llation instructions and the Manufactured Home Construction and Safety Standard Title 24 CFR Part 3280 or the current Standard of Fire Safety Criteria for Manufactured Home Installations Sites and Com...

Страница 3: ...41 Remote Control Optional 42 Wall Switch Optional 42 Wall Thermostat Optional 42 Wiring Diagrams 43 Optional Fan Installation 45 Optional Fan Removal 45 SAFETY LABEL Copy of Safety Decal 5 REQUIREMEN...

Страница 4: ...cement 48 Removing Valve 49 Installing Valve 49 REGENCY OPTIONS Flush Trim 51 Flush Louvers 51 Double Screen Door 51 Bay Door 52 Bay Trim 52 Bay Louvers 52 Full Screen Door Installation 53 Tripoli Arc...

Страница 5: ...e the label on the unit is the correct one SAFETY LABEL COPY OF SAFETY DECAL FOR P36D 1 For the State of Massachusetts installation and repair must be done by a plumber or gas tter licensed in the Com...

Страница 6: ...e directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VEN...

Страница 7: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 7 INSTALLATION UNIT DIMENSIONS...

Страница 8: ...o have all of your gas appliances checked annually 13 Do not slam shut or strike the glass door INSTALLATIONANDREPAIRSHOULD BE DONE BY A QUALIFIED SERVICE PERSON THE APPLIANCE SHOULD BE INSPECTED BEFO...

Страница 9: ...llationswhenusedwithaListedMillivolt Thermostat Some areas may have further requirements check local codes before installation 6 The P36D 1 Direct Vent Gas Fireplace is approvedforalcoveinstallations...

Страница 10: ...Clearances Bay or Flush Front 6 152mm Barcelona Front 6 152mm Hampton Cast Faceplate 6 152mm Kensington Front 6 152mm Balmoral Westminster Front 6 152mm Measured from Surround or Front See Regency Cl...

Страница 11: ...INSTALLATION Clearances for Bay or Flush Front Clearances for Barcelona Front REGENCY CLEARANCES PALACE SERIES CLEARANCES Clearances for The Balmoral The Westminster Front Clearances for The Kensingto...

Страница 12: ...NTEL CLEARANCES These drawings are to scale at 1 6 one inch 6 inches Mantel can be installed anywhere in shaded area or higher using the above scale Note Ensure the paint that is used on the mantel an...

Страница 13: ...t are shown in the diagram below Note A non combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non combustible board These drawings are to scale...

Страница 14: ...ing is heat resistant or the paint may discolour HAMPTON COMBUSTIBLE MANTEL CLEARANCES Mantel Clearances with Hampton Cast Faceplate 7 Because of the extreme heat this replace emits the mantel clearan...

Страница 15: ...on the mantel and the facing is heat resistant or the paint may discolour PALACE COMBUSTIBLE MANTEL CLEARANCES Because of the extreme heat this replace emits the mantel clearances are critical Combust...

Страница 16: ...l leg clearances as per diagram Maximum 1 1 2 projection at 2 minimum clearance PALACE SERIES MANTEL LEG CLEARANCES Combustible mantel leg clearances as per diagram Maximum 1 1 2 projection at 2 minim...

Страница 17: ...de Nailing Strips Top Facing Support and Top Standoffs before unit is slipped into position See Unit Assembly Prior to Installation section for assembly details 2 Frame in the enclosure for the unit w...

Страница 18: ...g the optional Barcelona Front or Palace Series a non combustible material 12 305mm above the unit and 6 153mm on each side must be used See diagram 1 The Barcelona Front and Palace Series also requir...

Страница 19: ...ptional Tripoli Arch Door a non combustible material 12 305mm above the unit and 6 153mm on each side must be used See diagram 2 The Tripoli Arch Door also requires steel stud framing above and on eac...

Страница 20: ...or C depending on your facing depth VENTING INTRODUCTION The P36D 1 uses the balanced ue technology Co Axial system The inner liner ventsproductsofcombustiontotheoutsidewhile the outer liner draws ou...

Страница 21: ...bove a meter regulator assembly within 3 90cm horizontally from the centerline of the regulator J Clearance to service regulator vent outlet min 36 90cm K Clearance to non mechanical air supply inlet...

Страница 22: ...eet 1 6 7 8 dia exible liner 4 ft length 2 4 dia exible liner 4 ft length 3 spring spacers 4 4 thimble 2 5 AstroCap termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated screws 8 9 screws 8 x 1...

Страница 23: ...DT EL45 4D45L 45O Elbow Black 945B 4DT EL45B 4D45LB 45O Elbow Swivel Galvinized 945G N A N A 45O Elbow Swivel Black 945BG N A N A 90O Elbow Galvinized 990 4DT EL90S 4D90LS 90O Elbow Black 990B 4DT EL9...

Страница 24: ...PI AstroCapTM and FPI Riser Vent terminal are certi ed for installations using FPI venting systems as well as Simpson Dura Vent Direct Vent GS American Metal Products Security Secure Vent AmeriVent Di...

Страница 25: ...6 7 8 inner diameter Maintain clearances to combustibles Horizontal vent must be supported every 3 feet Firestops are required at each oor level and whenever passing through a wall NOTE If you are ins...

Страница 26: ...learances to combustibles Note Must use optional rigid pipe adaptor when using rigid vent systems Part 510 994 VENTING ARRANGEMENTS VERTICAL TERMINATION RIGID PIPE SYSTEM Propane Natural Gas The shade...

Страница 27: ...he shaded area in the diagram 1 shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum two 45o elbow...

Страница 28: ...Please note minimum 1 foot between 90o elbows is required One 90o elbow Two 45o elbows Lengths do not include elbow indicated Option V H V V1 H H1 A 0 Min 1 Max 1 Min 2 Max B 1 Min 2 Max 3 Min 3 Max...

Страница 29: ...tical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required One 90o elbow Two 45o elbows Lengths do not include elbow indicated Option V H H1 V V1 A 0 Min 2 Max 2 Min B...

Страница 30: ...collar of the termination cap Required Parts Part Description 946 529 Co linear DV Vertical Termination Cap 948 305 3 Flex 35 ft 946 563 Co Axial to Co Linear Adapter Kit which contains the following...

Страница 31: ...ING ARRANGEMENT VERTICAL TERMINATIONS CO LINEAR FLEX SYSTEM INTO MASONRY FIREPLACES FOR BOTH RESIDENTIAL MANUFACTURED HOMES The shaded area in the diagrams show the allowable vertical terminations 8 M...

Страница 32: ...rindentations located on the female ends of pipes and ttings are designed to slide straight onto the male ends of adjacent pipes and ttings by orienting the four pipe indentations so they match and sl...

Страница 33: ...l hole at his point Next drop a plumb bob from the roof to the hole previously drilledintheceiling andmarkthespotwhere the vent will penetrate the roof Determine if ceilingjoists roofraftersorotherfra...

Страница 34: ...LEX INSTALLATION PROCEDURES 1 Locate the unit in the framing rough in the gas preferably on the right side of the unit and the electrical Junction block is on the left side on the left Locate the cent...

Страница 35: ...ern will have small probably yellow ames not coming into proper contact with the rear burner or thermopile or thermocouple alwaysbesttoconsultwithyourlocalauthorities and the CAN CGA B149 installation...

Страница 36: ...Instruction Sheet 5 Remove the 2 screws holding the Burner Assembly to the firebox base Push the Burner Assembly to the left and lift out DC Sparker Kit Contains Qty Part Description 1 820 475 Bracket...

Страница 37: ...unting bracket 23 Disconnect the ignitor wire from the Piezo Ignitor and connect it to the DC Sparker Piezo Ignitor Ignitor Wire Piezo Ignitor Ignitor Wire DC Sparker 24 Install the 3 4 nylon plug to...

Страница 38: ...ontrol 39 Check for proper flame appearance and glow on logs NOTE The battery in the DC Sparker Box will need to be replaced an nually 25 Connect the DC spark generator wires to the SIT Valve with the...

Страница 39: ...tional Brick Panels install the Brick Panels prior to installing the logs 1 Carefully remove the logs from the box and unwrap them The logs are fragile handle with care do not force into position 2 Sp...

Страница 40: ...ar grate tab 02 50 02 55 02 75 0 2 5 3 02 51 02 54 02 Front Brackets 02 50 02 53 Notch 02 50 02 55 02 53 9 Sit Log 02 50 on the front left side of the burner Push the back of the log against the 2 fro...

Страница 41: ...ard ush door comes with a black frame To install the frame simply hook the top door ange onto the top of the unit and swing the door towards the unit see diagram 1 Be careful that the glass gasket doe...

Страница 42: ...e control kit comes with a hand held transmitter a receiver and a wall mounting plate 1 Choose a convenient location on the wall to install the receiver and the receptacle box protection from extreme...

Страница 43: ...acle box provided with the unit in case the fan is installed at a later date CAUTION Label all wires prior to disconnection when servic ing controls Wiring errors can cause improper and dangerous INST...

Страница 44: ...1 Zero Clearance Direct Vent Gas Fireplace 44 For PROPANE Units and Units Equipped with DC Spark Boxes For installation of the DC Spark Box refer to the LP Conversion instructions in this manual INST...

Страница 45: ...thecontrolbox Ensure that there is no interference with the wires when the louver is closed and that no wire will touch the hot metal surfaces or sharp edges 13 Plug the fan power cord into the rear e...

Страница 46: ...ing process The glass should be cleaned or the lm will bake on and become very dif cult to remove Use a non abrasive cleaner and NEVER clean the glass while it is hot AERATION ADJUSTMENT The air shutt...

Страница 47: ...e burnertube s andlogsandismadeofadifferent gauge material from the rest of the rebox and body Therefore thevaryingthicknessesofsteel will expand and contract at slightly different rates which can cau...

Страница 48: ...sition of these logs must be as shown in the diagrams under Log Installation Note Improper positioning of logs may create carbon build up and will severely alter the unit s performance which is not co...

Страница 49: ...rformance 9 Reinstall the 10 hold down screws 10 Hook up the 2 TP and 2 TH wires to the appropriate connections on the valve 11 Reinstall the bottom brick panel and the front log stand 12 Install Burn...

Страница 50: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 50 FLUSH BAY DOOR OPTIONS...

Страница 51: ...side of the bottom louver Push down to lock into place Tighten the screws Burner ON OFF control box attached to bottom ush louver Screws on louver bracket Burner ON OFF control box FLUSH TRIM Attach...

Страница 52: ...Slide the Bay De ector into the 2 Bay De ector brackets in the top of the unit 2 Hook the top of the bay door over the ush door ange and swing the bottom against the bottom ange of the ush door 3 Sec...

Страница 53: ...ner cut outs to secure the base of the Frame using the 2 x Hex Head Drill Point Screws provided Backside of Full Screen Door Frame Shown Inside Top of Outer Frame Hinge Bracket Inner Hinge Bracket Scr...

Страница 54: ...all the Left and Right Side Screen Doors in the fully open position by placing over top of the hinges on the Full Screen Door Frame NOTE Failure to install the doors in the fully open position could r...

Страница 55: ...The facing material has to go on after the unit is set 1 Remove Glass Door 2 Remove 2 screws and bracket as indicated refer to Diagram 2 3 Install On Off switch refer to Diagram 3 Diagram 2 Diagram 3...

Страница 56: ...with the corresponding hole on the Top Support Frame then secure with 1 screw b Repeat step on the other side 10 Change Logo Replace existing logo with Regency logo a Mount Side Support Frame to unit...

Страница 57: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 57 CAST FACEPLATE...

Страница 58: ...of faceplate with screw 4 Repeat step 3 for the right side faceplate Secure bottom of faceplate with screw 5 Slide top piece of faceplate into side faceplates by tting mounting plates into brackets 6...

Страница 59: ...oved in step 3 5 Install hinge to bracket then secure with screw New hinge bracket Left side shown 6 Place something underneath bottom grill to prevent scratching 7 Line up hinge holes in bottom grill...

Страница 60: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 60 The Westminster Front The Kensington Front The Balmoral Front...

Страница 61: ...racket inside top of rebox Kensington Front frame 4 Removeexistingcontrolswitchboxfromunder reboxbydisconnecting wires connected to the valve at TH TH TP terminals and discard Wires connected to Valve...

Страница 62: ...he inner screw on the hinge brackets on both the left and right side of the rebox Slide frame in place and secure Left Side Shown Hinge bracket on bottom of rebox 4 Slide tabs into louver brackets loc...

Страница 63: ...right side of the rebox Slide frame in place and secure Left Side Shown Hinge bracket on bottom of rebox 4 Removeexistingcontrolswitchboxfromunder reboxbydisconnecting wires connected to the valve at...

Страница 64: ...over 3 Connect new fan control box wires to the existing fan plug wires red to red black to black Disconnect Wires Fan Control Box Fan Control Box Vertical Hinge Bracket Discard Fan Cover with Wires N...

Страница 65: ...ews 1 Install sub frame by hooking top over glass door push in bottom of frame and secure with 2 screws Sub Frame 2 Mount 2 panel door frame to ange on sub frame ensuring to line up holes Secure using...

Страница 66: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 66 REPLACEMENT PARTS LIST...

Страница 67: ...ON OFF 3 way 910 899 Wire Harness Valve to Burner 432 917 Fan Speed Control Assy 120 Volts Optional 42 910 331 P Fan Motor 432 966 Fan Switch Assy 120 Volts Optional 43 910 813 Power Cord 120 Volts 4...

Страница 68: ...lve Tray NG LP 57 910 478 Valve S I T Natural Gas Propane 58 Valve Bracket 65 Pilot Bracket 66 910 038 Pilot Assy S I T 3 Flame NG 910 039 Pilot Assy S I T 3 Flame LP 67 Pilot Holder 68 W840470 Pilot...

Страница 69: ...Red 780 938 Bay Front Trim Set Brass 780 936 Bay Front Trim Set Steel 112 Bay Front Trim Top Bottom 780 934 Bay Front Trim Set Gold 113 Bay Front Trim Gold Bottom 114 Bay Front Trim Gold Top 510 988 B...

Страница 70: ...923 Flush Louvers Set Steel Black 138 Flush Louver Assy Top 139 Flush Louver Assy Btm 146 Barcelona Assy Black 148 Barcelona Louver Assy Black 510 934 Flush Glass Trim Set Brass 510 947 Flush Glass Tr...

Страница 71: ...LY Part Description 513 971 Cast Faceplate Set 201 Cast Faceplate Right 202 Cast Faceplate Top 203 Cast Faceplate Left 513 981 Cast Grills Set 204 Top Grill 205 Bottom Grill Not available as a replace...

Страница 72: ...__________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _________________...

Страница 73: ...__________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _________________...

Страница 74: ...__________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _________________...

Страница 75: ...nd inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of FPI to charge for larger higher priced...

Страница 76: ...n Panorama Palace AstroCap Kensington Westminster Balmoral Tripoli HeatWave and Heat Release are trademarks of FPI Fireplace Products International Ltd FPI replaces are designed with reliability and s...

Отзывы: