![FP optimail Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/fp/optimail/optimail_installation-manual_2325895014.webp)
optimail Installation Guide
14
If you are using the Universal Link Box:
(optional)
• Set up the Universal Link Box (ULB)
according to the enclosed manual.
• Use the adapter (D-Sub, 9-pin male / 25-
pin male) to plug the connection cable to
the serial interface of optimail.
• Plug the AC adapter of the ULB into a
grounded single-phase power socket.
Make sure your office power supply con-
forms to power requirements shown on the
AC adapter’s serial number plate.
Power cable
• Connect the power cable to the postage
meter. The power connection is at the rear
of the optimail.
• Plug the power plug into a grounded
single-phase power socket.
Make sure your office power supply con-
forms to power requirements shown on the
serial number plate of the optimail.
Connection cable
Network cable
Power connection
(AC adapter)
Adapter
Power cable
Содержание optimail
Страница 1: ...optimail Postage meter Installation Guide ...
Страница 28: ...optimail Installation Guide 28 ...
Страница 29: ...For your notes 29 ...
Страница 30: ...For your notes 30 ...
Страница 32: ...51 0034 3084 00 Rev 02 2010 05 xxx helbig berlin ...