FB400 L1~L2 Service Document
Version 1.0
Company Confidential
14/18
Unauthorized Copy Not Allowed
7. Assemble case a and side band, please take care of the
FPC
8. Assemble speakers in side band.
9. Assemble shielding case on main board.
10. Assemble shielding case on main board.
11. Paste sponge on main board.
12. Paste conductive pad on main board.