
DAD.MDP.026.003_a
not contractual document
28/31
The deck shower is shut-off with a valve.
2)
Use of toilet.
Check that the sea water supply and evacuation valves
for toilet) are opened. Under the floor in front starboard
side.
Place the toilet lever to the “Water in” position and pump
for at least 10 strokes to evacuate and dilute the black
water.
Содержание SUMMERLAND 40 LC
Страница 1: ......
Страница 8: ...DAD MDP 026 003_a not contractual document 8 31...
Страница 9: ...DAD MDP 026 003_a not contractual document 9 31 1 Starting the engine...
Страница 10: ...DAD MDP 026 003_a not contractual document 10 31...
Страница 12: ...DAD MDP 026 003_a not contractual document 12 31 2 Stopping...
Страница 13: ...DAD MDP 026 003_a not contractual document 13 31...
Страница 22: ...DAD MDP 026 003_a not contractual document 22 31 CONFORT A Electrical installations 1 Circuit 12V...