
12
F11
OPERATION 5
5a
Take the hood towards the ceiling, insert the top
structure into the threaded bars and ix it with
washers and nuts Y (2 nuts per bar).
ATTENTION!
Fix with double nuts in order to avoid the loose
-
ning due to vibrations.
OPERATION 6
6a
Connect the fumes evacuation pipe and arran-
ge the electrical connection.
6b
Take the sliding pipe upwards and ix with
screws Z.
(fig. 6)
(fig. 5)
Z
Y
Y