
Assembly Of Wall Panel
Note: there is no door header panel, as this is integral with the ceiling panel.
Fit the side panel into the channel and apply a bead of masti c (see fi gs) to create a vapour seal. Place the
rear panel in the channel, these can now be locked together (see fi g 2). Repeat this process for the
remaining panel unti l all panels are locked internally.
Fig 1
Fig 2
Fig 3
Fitti ng The Ceiling Panel
At the top of the wall panels there is a recess that accepts the ceiling.
Apply masti c to the recess so that when the panel is fi tt ed there is a good vapour seal.
Slacken the screws securing the front panel to the sides and rest it securely on the top of the ceiling panel,
taking care not to damage the interconnecti ng cables, See below.
Lift the ceiling panel complete and lower into the top recess.
With the ceiling panel in place slide the galvanised angle bracket into place (see fi g 4). Secure using the
screws provided (see fi g 5 and 6).
English
5
Содержание FADPRT2
Страница 10: ...English 9 Changing Clock Calendar...
Страница 11: ...English 10 3 Secs 2 minutes Starting a Manual Prove Program 1 to 900 mins Display during program...
Страница 14: ...English 13 2 minutes 3 Secs Cancelling an Automatic Prove Program...
Страница 15: ...English 14 How to change the settings for a Automatic Prove Program Storage 0 to 25 c...
Страница 16: ...English 15 Prove time Prove Temperature 10 to 40 c 1 to 900 mins...
Страница 17: ...English Hold 16 0 to 25 c...
Страница 18: ...English 17 Page left Blank Intentionally...
Страница 19: ...English 18 Page left Blank Intentionally...