GB
1
If the cabinet has been laid on its back at any time DO NOT switch on immediately but leave
in the upright position for at least 60 minutes.
Important:
Ensure a minimum clearance of 150mm above the unit and adequate ventilation
for efficient operation. Where possible, ensure the unit is away from a heat source.
Unpacking:
The unit is delivered on a pallet and shrink-wrapped. Documentation is inserted
into a clear pocket inside the unit. Carefully remove the protective plastic film and cardboard
from the unit exterior and from the door opening surround making sure that any sharp
instrument used does not cause damage, plus remove any quality labels.
Cabinet removal from the pallet:
Remove the shelf holding the package containing the
castors. Remove the retaining bolts which secure the unit to the pallet. Move the unit over the
front of the pallet fit the lockable castors in the mounting holes. To fit the rear castors, lock
the front castors, tilt the unit forwards, remove the pallet and fit the castors in the mounting
holes. Ensure that all are tightened firmly into position.
Ensure during installation the unit is level if not the door may not close correctly.
Adjust castors by inserting spacers, supplied separately, under the appropriate castor and the
base of the unit until level.
When mains electrical power is first applied to the controller it will carry out a self-test
function, for approximately 3 seconds
.
If not disposed of properly all refrigerators have components that can be harmful to the
environment.
All old refrigerators must be disposed of by appropriately registered and licensed waste
contractors, and in accordance with national laws and regulations.
Foster Refrigerator recommends that the equipment is electrically connected via a Residual
Current Device; such as a Residual Current Circuit Breaker (RCCB) type socket, or through a
Residual Current Circuit Breaker with Overload Protection (RCBO) supplied circuit.
Time
Phase
1
Phase
2
Storag
e
P1 Set
Point
P1Hysteres
ist
Storage
Hysteresis
Storage Set
Point
Start
Temperature
Te
m
p
e
ra
tu
re
Controller Operation
Содержание CT75
Страница 6: ...GB 5 Page Left Blank Intentionally ...
Страница 7: ...GB 6 Page Left Blank Intentionally ...