background image

 Assembly Instructions

Step 1

Step 2

With assistance, place the pizza oven body assembly (A) upside down on a soft, level surface.

Then unfold four legs (pre-assembled) as illustrated.

A

A

H

Install the ash tray (H) to the pizza oven body assembly (A) as illustrated.

Содержание FPPO14PSS

Страница 1: ...16758 7 21 0 18 287 225 3 29 1 332 366...

Страница 2: ...HIRUH RX 6WDUW 6DIH 8VH 3URGXFW 0DLQWHQDQFH SORGHG 9LHZ VVHPEO QVWUXFWLRQV 8VH QVWUXFWLRQV Table of contents...

Страница 3: ...ALWAYS ALWAYS DO NOT CAUTION CAUTION Before you start Food cooking information Safety warning 2QO XVH SHOOHWV LQWHQGHG IRU XVH LQ FRRNLQJ 7KH UHFRPPHQGHG SHOOHW OHQJWK VKRXOG ODUJHU FXWV RI PHDW EH Q...

Страница 4: ...6DIH 8VH Protection Things to check before you start IMPORTANT Lighting procedures WARNING Before each cooking session Replenishing the pellet Extingushing the pizza oven 01 02 03 06 05 04...

Страница 5: ...ce The golden rules for care IMPORTANT At the beginning of the season Before each use After each use Cooking surfaces pizza stone etc Ash tray Pizza oven body After 2 or 3 uses At the end of the seaso...

Страница 6: ...r assembly not included Phillips screwdriver QUANTITY PART QUANTITY A Pizza Oven Body Assembly 1 H Ash Tray 1 B Chimney Pipe 1 I Poker 1 C Hopper Shovel 1 J Pizza Stone 1 D Hopper Assembly 1 K Door 1...

Страница 7: ...1 Step 2 With assistance place the pizza oven body assembly A upside down on a soft level surface Then unfold four legs pre assembled as illustrated A A H Install the ash tray H to the pizza oven body...

Страница 8: ...p over the pizza oven body assembly A as illustrated A Step 4 Install the hopper assembly D to the pizza oven body assembly A with two M4 10 screws N as illustrated PlHDsH disassemble screws N from th...

Страница 9: ...ions J A Step 5 Put the pizza stone J into the pellet pizza oven assembly A as illustrated Step 6 Attach the door handle L to the door K with 2 pcs M4 x10 screws N as illustrated Tighten screws with s...

Страница 10: ...hen put into the pizza oven body assembly A as illustrated F K G A A Assembly Instructions Step 7 Place the chimney pipe B onto the pizza oven body assembly A and turn clockwise by hand into position...

Страница 11: ...rate the fire box assembly G ash tray H and lid of hopper assembly D Do not leave the fire box assembly handle F on above locations during use as it may get hot Step 10 The hopper shovel C can be used...

Страница 12: ...JULG DQG ILUH ER DVVHPEO LQWR WKH EDFN RI SL D RYHQ ZLWK WKH KDQGOH SXW WKH GRRU RQ DQG FRYHU WKH KRSSHU OLG HHS EXUQLQJ IRU DERXW PLQXWHV 3ODFH WKH ILUH ER DVVHPEO RQWR DQ HYHQ DQG QRQIODPPDEOH VXUID...

Страница 13: ...vided handle VWLFNLQJ 7LS 7LS 0LQG WR REVHUYH WKH IODPH EHIRUH LW EHFRPHV ZHDN DQG KHDW LV LQVXIILFLHQW UHILOO WKH SHOOHW IXHO SURSHUO WR PDLQWDLQ SHUIHFW EDNLQJ If burning time exceeds 1 hour use a p...

Страница 14: ...t This is to prevent too much air coming in from the oven door which may cause heavy smoke inside the fire box assembly E G and hopper assembly D Always operate the door with provided handle Cleaning...

Страница 15: ...Ez d z W Ks E d d d d d D d d KZd d EKd E E W D h KZd Z W Ks E W z W Ks E KZd Z Z h d t W W w Gv G G G...

Отзывы: