
P| 11
FOREVER PORCH PAVILION
www.ForeverRedwood.com
Step 13:
Attach the rafters
(11)
to the ridge board with 5/16’’ x 3’’ lag bolts
(A)
. After that
use 5/16’’ x 3’’ lag bolts
(A)
to attach
the metal plaques
(16)
to the support with in-between blocking and attach the metal plaques to the rafter with 5/16´´ X 2 ½´´
bolts. Each part has a series of numbers that indicate where to attach the part with the corresponding number.
Step 14:
Attach the roof boards
(12)
to the triangles and the rafters with 6” x 1 5/8’’deck screws
(I)
. Each part has a series of
numbers that indicate where to attach the part with the corresponding number.
12
11
11
5/16´´ X 3´´ Lag Bolts
5/16´´ X 3´´ Lag Bolts
1 5/8´´ Deck Screw
12
5/16´´ X 2 ½ ´´ Bolts
16
16