![Forever Redwood DEL RIO CATHEDRAL CEILING THICK TIMBER PAVILION Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/forever-redwood/del-rio-cathedral-ceiling-thick-timber-pavilion/del-rio-cathedral-ceiling-thick-timber-pavilion_assembly-instructions-manual_2319580009.webp)
P| 8
DEL RIO CATHEDRAL CEILING THICK TIMBER PAVILION
www.ForeverRedwood.com
Step 8:
Attach the main knee braces
(6)
to the posts with 3/8´´ x 12´´ bolts
(E)
and 3/8´´ x 16´´ bolts
(F)
. After that, attach to the
supports with 3/8´´ x 8´´ bolts
(C)
. Each part has a series of numbers that indicate where to attach the part with the corresponding
number.
Step 9:
Use 3/8´´ x 9 ½´´ bolts
(G)
to attach the roof panels
(7)
to the perimeter triangles and 3/8´´ x 11´´ bolts
(H)
to attach the
roof panels
(7)
to the central triangles, as shown below. Each part has a series of numbers that indicate where to attach the part
with the corresponding number.
3/8´´ X 11´´ Bolts
7
3/8´´ X 9 ½´´ Bolts
6
3/8´´ X 8´´ Bolts
3/8´´ X 8´´ Bolts
6
6
3/8´´ X 12´´ Bolts
3/8´´ X 16´´ Bolts
6
7