background image

 

P| 14 

ANDREA´S CUPOLA PAVILION  

www.ForeverRedwood.com 

 

Step 13:

 Attach the fascia board

 (20)

 whit 3´´deck screws

(K)

. Attach the overhang boards 

(18, 19)

 whit 1 5/8´´ deck screws 

(L)

.  

 

Step 14: 

Attach the corner knee braces 

(6, 7)

 to the posts and to the supports with 3/8´´ x 12´´ Bolts 

(I)

. After that attach the 

center braces together 

(6, 7)

 whit 3/8´´ x 18´´ Bolts 

(J)

 and with the support with 3/8´´ x 12´´ Bolts 

(I)

 

 
 
 
 
 
 
 
 
 
 
 

3´´ Deck Screws 

 

3/8´´ x 12´´ Bolts 

 

3/8´´ x 18´´ Bolts 

 

3/8´´ x 12´´ Bolts 

 

19 

18 

18 

19 

20 

20 

Содержание ANDREA'S CUPOLA PAVILION

Страница 1: ...ASSEMBLY INSTRUCTIONS FOR THE ANDREA S CUPOLA PAVILION 866 332 2403 TOLL FREE 7am 7pm Pacific Time Monday Saturday ...

Страница 2: ... 9 10 Drawing Description Posts Supports Triangle 1 Triangle 2 Long Ridge Beam Corner Knee Braces Center Knee Braces Rafters Bridge Small Rafters Qty Will vary Note Part numbers in the Content of Boxes Table are for reference only These do not match to the numbers marked on the parts sent ...

Страница 3: ...wing Description Triangle 3 Short Ridge Beam Diagonals Diagonals Short Rafters Short Rafters Long Overhang Board Short Overhang Boards Fascia Board Roof Boards Boots Qty Will vary Note Part numbers in the Content of Boxes Table are for reference only These do not match to the numbers marked on the parts sent ...

Страница 4: ...4 25 26 27 28 29 30 31 32 Drawing Description Cupola Anchor base T Supports Angles A Angles B Angles C Angles D Angles E Angles F Angles G Qty Will Note Part numbers in the Content of Boxes Table are for reference only These do not match to the numbers marked on the parts sent ...

Страница 5: ... supports To attach the Angles A B C to the triangles 3 8 X 6 Lag Bolts To attach the ridge beams to the triangles To attach the rafters to the ridge beams To attach the diagonals to the bridge 3 8 X 4 Lag Bolts To attach the rafters to the ridge beams To attach the angles E to the bridges To attach the rafters to the bridges and to the ridge beams 5 16 X 3 Bolts To attach the Angles D to the raft...

Страница 6: ... 18 Bolts To attach the knee braces to the central posts 3 Deck Screws To attach the short rafters to the diagonals To attach the fascia boards To attach the boots to the posts 1 5 8 Deck Screws To attach the overhang boards and the roof boards 5 Deck Screws To attach the cupola to the roof boards Washers 3 8 Nuts Note Part numbers in the Content of Boxes Table are for reference only These do not ...

Страница 7: ...reverRedwood com No 1a 2 3 4 5 8 9 11 13 16 17 19 20 24 DESCRIPTION Posts Support Triangle 1 Triangle 2 Long Ridge Beam Rafters Bridge Triangle 3 Short Ridge Beam Diagonals Diagonals Short Overhang Boards Fascia Board Anchor base 1 1 1 1 ...

Страница 8: ...ngs Don t attach yet only place them on the ground to begin with Step 1 Install the anchor base 24 with X 4 anchor bolts A or lag bolts Please see the How to anchor your pergola document for all details Set your post 1 in the saddle of the anchor bases 24 Drill a ø hole in the post prior to anchoring to facilitate the ratcheting of the hardware After that use a 5 16 X 3 lag bolts B to attach each ...

Страница 9: ...5 3 8 X 8 bolts C and 3 8 X 3 Lag Bolts B to attach the supports 2 to the posts Each part has a series of numbers that indicate where to attach the part with the corresponding number 2 2 3 8 X 8 Bolts 3 8 X 3 Lag Bolts 3 8 X 3 Lag Bolts Exterior Side Exterior Side Interior Side 25 ...

Страница 10: ... Angles B 27 and Use Angles C 28 whit 3 8 X 3 Lag Bolts B and 3 8 X 8 C to attach the Triangles 3 4 to the supports Each part has a series of numbers that indicate where to attach the part with the corresponding number 3 8 X 3 Lag Bolts 26 26 3 3 3 8 X 3 Lag Bolts 3 8 X 8 Bolts 4 4 27 3 8 X 3 Lag Bolts 3 8 X 8 Bolts 28 3 4 27 28 28 27 27 27 28 28 26 ...

Страница 11: ...tach the part with the corresponding number Step 6 Use Angles D 29 5 16 x 3 bolts F and 3 8 x 3 lag bolts B to attach the rafters 8 to the supports After that attach the rafters to the beam with 3 8 x 4 lag bolts E Each part has a series of numbers that indicate where to attach the part with the corresponding number 3 8 X 6 Lag Bolts 5 5 8 5 16 X 3 Bolts 3 8 X 4 Lag Bolts 3 8 X 3 Lag Bolts ...

Страница 12: ...ith the corresponding number Step 8 Attach rafters 10b to the long ridge beam and to the bridge with 3 8 x 4 lag bolts E After that attach to the rafters 10a to the long ridge beam whit 3 8 x 6 lag bolts D and to the bridge with 3 8 x 4 lag bolts E Each part has a series of numbers that indicate where to attach the part with the corresponding number 3 8 X 2 Lag Bolts or 3 8 X 3 Lag Bolts 9 9 10b 1...

Страница 13: ...he supports with 3 8 x 12 Lag Bolts H Step 10 Attach the short ridge beam 13 to the bridge with Angle G 31 and 3 8 x 2 Lag Bolts G After that attach the short ridge beam 13 to the triangle 3 11 whit 3 8 x 6 Lag Bolts D 3 8 X 12 Lag Bolts 3 8 X 6 Lag Bolts 3 8 X 2 Lag Bolts 11 11 13 13 3 8 X 2 Lag Bolts ...

Страница 14: ... the support whit Angle G 32 and 3 8 x 3 Lag Bolts B Step 12 Attach the short rafters 16 17 to the bridge and short ridge beam 13 whit and 3 8 x 4 Lag Bolts E After that attach the short rafters 16 17 to the diagonals whit 3 deck screws L 3 8 X 6 Lag Bolts 3 8 X 3 Lag Bolts 3 Deck Screws 3 8 X 4 Lag Bolts 14 15 15 15 15 14 14 14 16 16 17 17 17 17 ...

Страница 15: ...ds 18 19 whit 1 5 8 deck screws L Step 14 Attach the corner knee braces 6 7 to the posts and to the supports with 3 8 x 12 Bolts I After that attach the center braces together 6 7 whit 3 8 x 18 Bolts J and with the support with 3 8 x 12 Bolts I 3 Deck Screws 7 6 7 6 6 6 3 8 x 12 Bolts 3 8 x 18 Bolts 3 8 x 12 Bolts 7 19 18 18 19 20 20 ...

Страница 16: ...s from the bottom to the top Each part has a series of numbers that indicate where to attach the part with the corresponding number Step 15 Use 5 deck screws M to attach the cupola 23 to the roof boards Each part has a series of numbers that indicate where to attach the part with the corresponding number 1 5 8 Deck Screws 22 23 5 Deck Screws ...

Страница 17: ...ION www ForeverRedwood com Step 16 Finally use 3 deck screws K to attach the boots 22 to the posts Each part has a series of numbers that indicate where to attach the part with the corresponding number 3 Deck Screws 22 22 22 22 ...

Страница 18: ...ILION www ForeverRedwood com This completes the Pavilion assembly Hope you enjoy your set for many decades If you ever have a problem or a question don t hesitate to call us 866 332 2403 or email us We are here to support you ...

Отзывы: