![Forest SHUTTLE iOn Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/forest/shuttle-ion/shuttle-ion_installing_2319190004.webp)
4 │
Installing the FOREST SHUTTLE
®
iOn battery motor
v1.1
Shuttle® iOn Battery:
When the battery is getting low, the Shuttle® iOn motor will begin to operate slower, (6 cm/s – 2,36”/s),
this is an indication to re-charge the battery.
Charging the battery:
Take out the battery from the Shuttle® iOn motor and connect the charger to the battery as pictured below:
Charging:
The charger is equipped with an indicator LED on the front side, this LED indicates the actual charging status.
Charging time battery is 5 hours;
Do not use third party battery chargers;
Do not attempt to repair the charger if damaged; replace the charger in this case;
Do not charge the battery in humid conditions;
Replace charger if damaged;
Do not expose the battery pack to direct sunlight while charging;
Do not repair the battery pack if damaged;
Replace the battery pack if damaged;
Do not charge the battery in ambient conditions below 10⁰C (50⁰F);
Dispose properly.
LED Orange:
LED Green:
Battery is charging
Battery is fully charged
Squeeze to
release
Содержание SHUTTLE iOn
Страница 1: ...FOREST SHUTTLE iOn ...