![Forest OPASUM75M Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/forest/opasum75m/opasum75m_instructions-manual_2319198009.webp)
1291mm
(7x5 Measur
ement)
498mm
580mm
28mm
Z-BRACKET
PREPARATION
Before placing the OSB roof sheets onto the roof,
screw the
roof support strips
along the edge of the OSB roof sheets.
Ensuring they are flush to the edges. Add one strip onto each
sheet as shown below. The strip will be the same length as one
side of the sheet.
PREPARATION:
Attach the
Z-brackets onto the face at
both ends on all the beams as
shown below. The beam should
be flush to the Z-bracket.
ATTACHMENT:
Screw the Z-brackets
onto both
of the Apex Section frames
to secure the beams
as shown below. Use the measurements provided.
Ensure you are measuring to and from the beams
and the inner wall panel frame shown below.
ROOF STRUCTURE
5a
ATTACHMENT
412mm
500mm
498mm
580mm
7X5 MEASUREMENTS
6X4 MEASUREMENTS
Ensure the
Z-brackets are
in this position
to screw onto
the Apex
Sections
frame.
482mm
564.5mm
8x6 MEASUREMENT
7x7 MEASUREMENT
1105mm
(8x6 Measur
ement)
1291mm
(7x7 Measur
ement)
Before placing the OSB roof sheets onto the roof,
screw the roof support strips
along the edge of the
OSB roof sheets. Ensuring they are flush to the edges.
Add one strip onto each sheet as shown below. The
strip will be the same length as one side of the sheet.
TOP TIP:
Layout all the truss components.
Assemble the truss
and screw the U-brackets into the
center of each beam as shown below. Ensure the truss
support brackets are added first and flush to the edge of
the central beams to establish the correct angle.
Secure the
support
bracket hanger
with screws into the center of your
summerhouse. There needs to be one at
each side.
Screw the truss to the support bracket hangers.
As a result the truss will be centralised inside your
summerhouse and facing the Apex sections.
28mm
Z-BRACKET
U-BRACKET
PREPARATION:
Attach the Z-brackets
onto the face of one end of each
beam as shown below. The beam
should be flush to the Z-bracket.
ATTACHMENT:
Secure the
other end of the beams to
the U-brackets on the truss by
screwing from the underside of
the beam.
Screw the Z-brackets
that are already attached
to beams
onto the apex
section frame.
PREPARATION
ATTACHMENT
Ensure the Z-brackets
are in this position to
screw onto the apex
sections frame.
PRE-DRILL
WITH 5MM BIT
FOR BOLTS.
9
7X5 ROOF ASSEMBLY
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
7X7 & 8X6 ROOF ASSEMBLY
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.