Fix two of the rafters to the finial at right angles, screwing through the finial into
the end of the rafters with a single 100mm screw for each.
Lift the rafters on top of the pavilion and line the notches up. You will need a
person on a ladder in the middle of the structure to keep the rafters in place and
use small adjustments to make sure they are level and at the correct pitch.
Fix these in place screwing down through each rafter into the post using a 150mm
screw.
Place and fix the two remaining rafters against the finial fixing them by screwing,
at an angle ,through the top of the rafter into the finial using 1x100mm screw for
each.
Place the braces so that they are flush and tight against the
post and level with the top of the fascia as shown. Fix the brace
to the post using 2 x 80mm screws and to the fascias using
1x50mm screw through each side.
Again use a spirit level and adjust as required.